How does a manager decide whether the work breakdown structure should be based on a tree diagram
Question:
Fantastic news! We've Found the answer you've been seeking!
Step by Step Answer:
Answer rating: 58% (12 reviews)
There is no general rule M...View the full answer
Answered By
Jinah Patricia Padilla
Had an experience as an external auditor in Ernst & Young Philippines and currently a Corporate Accountant in a consultancy company providing manpower to a 5-star hotel in Makati, Philippines, Makati Diamond Residences
5.00+
120+ Reviews
150+ Question Solved
Related Book For
Project Management A Systems Approach to Planning Scheduling and Controlling
ISBN: 978-0470278703
10th Edition
Authors: Harold Kerzner
Question Posted:
Students also viewed these Management Leadership questions
-
How does a manager decide whether the management control system should be changed?
-
How are the work breakdown structure and change control connected?
-
How does a risk analysis operate? How does a manager interpret the results?
-
What is project scoping? Why is it important to good problem solving?
-
Seven years ago, Halle (currently age 41) contributed $4,000 to a Roth IRA account. The current value of the Roth IRA is $9,000. In the current, year Halle withdraws $8,000 of the account balance to...
-
Ascorbic acid (vitamin C) does not contain a traditional carboxylic acid group, but it is, nevertheless, still fairly acidic (pKa = 4.2). Identify the acidic proton, and explain your choice using...
-
What pleadings the defendant may file in response to the complaint?
-
Medical Dispensary borrowed $390,000 on January 2, 2012, by issuing a 10% serial bond payable that must be paid in three equal annual installments plus interest for the year. The first payment of...
-
Motor Corp. manufactures machine parts for boat engines. The CEO, James Hamilton, is considering an offer from a subcontractor who would provide 3,000 units of product AB100 for Hamilton at a price...
-
Water flows in a duct having a cross section 5 10 mm with a mean bulk temperature of 20oC. If the duct wall temperature is constant at 60oC and fully developed laminar flow is experienced, calculate...
-
Scheduling departmental manpower for a project is a very difficult task, even if slack time is available. Many managers would prefer to supply manpower at a constant rate rather than continually...
-
For the network shown in Figure with all times indicating weeks, answer the following questions: a. What is the impact on the end date of the project if activity B slips by two weeks? b. What is the...
-
Let y = sales at a fast-food outlet (1000s of $), x1 = number of competing outlets within a 1-mile radius, x2 = population within a 1-mile radius (1000s of people), and x3 be an indicator variable...
-
Given f(x)=2, please answer the following. a. Sketch a graph of f(x) = r on the coordinate plane in part b. b. g(x) is f(x) stretched vertically by a factor of 2, shifted downward 2 units, and...
-
Discuss how information systems can be used for automation, organizational learning, and strategic advantage. Describe how information systems support business models used by companies operating in...
-
Crane Mining Company purchased land on February 1, 2025, at a cost of $1,005,300. It estimated that a total of 55,800 tons of mineral was available for mining. After it has removed all the natural...
-
discuss the role of organizational policies and workplace interventions, such as flexible work arrangements, stress management training programs, and wellness initiatives, in fostering a supportive...
-
1) If the risk-free rate is 7%, have these securities been correctly valued? 2) Suppose the risk-free rate is 8% and the expected market return is 16%. If a particular stock has a beta of 0.7, what...
-
You believe that household income in a country has a mean of around $40,000 with a standard deviation of about $30,000. How large a sample should you take if you want the width of a 95 percent...
-
Write a paper by answer the following question: Should Recycling Be Mandatory?
-
Some high-street retailers may well regret sale-and-leaseback arrangements made in earlier years. Can you think why?
-
In March CV = $20,000, and in April CV = $30,000. In order to determine whether the situation has really deteriorated because of a larger unfavorable cost variance, we would need to calculate: A. CV...
-
In March CV = $20,000, and in April CV = $30,000. In order to determine whether the situation has really deteriorated because of a larger unfavorable cost variance, we would need to calculate: A. CV...
-
In March CV = $20,000, and in April CV = $30,000. In order to determine whether the situation has really deteriorated because of a larger unfavorable cost variance, we would need to calculate: A. CV...
-
You have been presented with the basic principles of personal finance, why do you think it is important to study this topic for a finance student? Among the basic principles of personal finance, what...
-
Since the Drug-Free Workplace Act of 1988 many U.S. employers have chosen to conduct drug testing as a pre-employment requirement, random testing of current employees, or a required test after a...
-
Use logarithms to solve. 2x-e-110=0
Study smarter with the SolutionInn App