Write a new version of Program 104 to use index array notation (with square brackets). Data from
Question:
Write a new version of Program 104 to use index array notation (with square brackets).
Data from Program 104
Transcribed Image Text:
#Stick some quiet space after that for index in range (0,1000): setSampleValueAt(target, targetIndex,0) targetIndex targetIndex + 1 #Let's hear and return the result play(target) return target
Fantastic news! We've Found the answer you've been seeking!
Step by Step Answer:
Answer rating: 71% (7 reviews)
def splicePreamble3 source makeSoundpreamble 10wav This will be the newly spliced sound target makeE...View the full answer
Answered By
Joseph Mwaura
I have been teaching college students in various subjects for 9 years now. Besides, I have been tutoring online with several tutoring companies from 2010 to date. The 9 years of experience as a tutor has enabled me to develop multiple tutoring skills and see thousands of students excel in their education and in life after school which gives me much pleasure. I have assisted students in essay writing and in doing academic research and this has helped me be well versed with the various writing styles such as APA, MLA, Chicago/ Turabian, Harvard. I am always ready to handle work at any hour and in any way as students specify. In my tutoring journey, excellence has always been my guiding standard.
4.00+
1+ Reviews
10+ Question Solved
Related Book For
Introduction To Computing And Programming In Python A Multimedia Approach
ISBN: 9780134025544
4th Edition
Authors: Mark J. Guzdial, Barbara Ericson
Question Posted:
Students also viewed these Computer science questions
-
Write a new version of Program 104 to copy We the into a new sound and then copy in united and finally copy in people. Be sure to add 2250 samples with a value of 0 in between the words. Return the...
-
Make a new version of your C++ program that creates instead a 2D array of 5x5 values of type boolean. Suppose indices represent people and that the value at row i , column j of a 2D array is true...
-
A software company has designed a new version of its search engine, and wants to investigate consumer response. A randomly selected group of users of the old search engine is selected, and given...
-
Most businesses will incur debt at some point during their existence. Question 26 options: True False
-
A heat pump using refrigerant-134a heats a house by using underground water at 8C as the heat source. The house is losing heat at a rate of 60,000kJ/h. The refrigerant enters the compressor at 280...
-
Repeat Prob.24.35, but use Romberg integration to s= 0.5%.
-
For each of the flows in Problems 1 and 2, for which an irregular structured grid has been found necessary and possible, suggest a coordinate transformation.
-
The following information shows last year's quality-related costs for the Madrigal Company: Total sales for the year were $120,000,000.Required(a) Prepare a cost-of-quality report grouping costs into...
-
Vermont Technologies is experiencing rapid growth. The company expects dividends to grow at 18 percent per year for the next eight years before leveling off at 8 percent into perpetuity. The discount...
-
Allie has bought a new apple orchard. The orchard has a single file of trees, numbered from 1 to N. Each tree has a certail number of ripe apples. Allie has a rule she wants to follow. She wants to...
-
Write a general scaleUp function that takes in any picture and creates and returns a new picture twice as big using makeEmptyPicture(width,height).
-
Write a function to input a sound, then create a canvas sound of the same length. Copy samples from the input into the canvas every other position, i.e., copy from index 0 in the input into the...
-
Find the volume of the following solid regions. The solid S between the surfaces z = ey and z = -exy, where S intersects the xy-plane in the region R = {(x, y): 0 x y, 0 y 1} X z = ex-y R z=-ex-y
-
Keller Company makes two models of battery-operated boats, the Sandy Beach and the Rocky River. Basic production information follows: Sandy Beach Direct materials cost per unit Direct labor cost per...
-
Part 5: Questionnaires. Develop a questionnaire that you will distribute (at a later date) to collect quantitative information (24 points) a) From the information you have gathered in your...
-
Check my work As the chief financial officer of Adirondack Designs, you have the following information: Next year's expected net income after tax but before new financing Sinking-fund payments due...
-
Direct Manufacturing Materials Purchased Direct Manufacturing Materials Used Direct Materials Price Variance (at time of purchase) Direct Materials Efficiency Variance Direct Manufacturing Labor...
-
(a). Use the definition of the derivative to evaluate the following function. 2 f(x) = x3
-
In March 2014, Harris Interactive conducted a poll of a random sample of 2234 adult Americans 18 years of age or older and asked, "Which is more annoying to you, tailgaters or slow drivers who stay...
-
Assume that your audit team has established the following parameters for the examination of ELM's sales transactions: LO G-3 Risk of incorrect acceptance...
-
A math class has 25 students. Assuming that all of the students were born in the first half of the yearbetween January 1st and June 30th what is the probability that at least two students have the...
-
Alice and Bob use RSA public key encryption in order to communicate between them. Trudy finds out that Alice and Bob shared one of the primes used to determine the number n of their public key pairs....
-
Using the RSA public key cryptosystem, with a = 1, b = 2 . . . y = 25, z = 26. (a) If p = 5 and q = 13, list five legal values for d. (b) If p = 5, q = 31, and d = 37, find e. (c) Using p = 3, q =...
-
2x1 + 4x2 3, 0 x 1, 0 x 1.
-
buildtree (T) : readln (L,,,, lowercase), processlist (L, nil,T). run print ('Please enter integers to build a tree: '), buildtree (T), print('Here is the tree:'), print (T), print('\PYGZbs (n'}),...
-
subject to: Maximize 6x + 14x2 + 13x3, x+2x2+4x324 (Metalworking capacity), x1+2x2+4x360 (Woodworking capacity), x10, x2 0, x3 0, obtaining an optimal tableau:
Study smarter with the SolutionInn App