Pocket Projects Ltd is a company specialising in the construction of schools for the Eastern Cape...
Fantastic news! We've Found the answer you've been seeking!
Question:
Transcribed Image Text:
Pocket Projects Ltd is a company specialising in the construction of schools for the Eastern Cape government. They were awarded a contract to construct a two-storey building in Butterworth. A contract price of R12 800 000 was agreed upon and work commenced on 2 March 2021. It was expected that the building would be completed in two and a half years and that total costs would amount to R9 600 000. At year-end 30 November 2021 actual costs incurred totalled R3 000 000, remaining costs were estimated at R6 600 000 and Pocket Projects Ltd had received billings to date of R4 480 000. The performance obligation will be satisfied over time and as such, Pocket Projects Ltd recognises revenue using the percentage of completion method based on time elapsed since the start of the project to the total expected time. Required: Establish what the value for contracts with customers will be that Pocket Projects Ltd should present in their statement of financial position on 30 November 2021. Indicate clearly whether this will be a contract asset or a contract liability. Show all your workings to calculate the amount presented. Round to the nearest rand. Pocket Projects Ltd is a company specialising in the construction of schools for the Eastern Cape government. They were awarded a contract to construct a two-storey building in Butterworth. A contract price of R12 800 000 was agreed upon and work commenced on 2 March 2021. It was expected that the building would be completed in two and a half years and that total costs would amount to R9 600 000. At year-end 30 November 2021 actual costs incurred totalled R3 000 000, remaining costs were estimated at R6 600 000 and Pocket Projects Ltd had received billings to date of R4 480 000. The performance obligation will be satisfied over time and as such, Pocket Projects Ltd recognises revenue using the percentage of completion method based on time elapsed since the start of the project to the total expected time. Required: Establish what the value for contracts with customers will be that Pocket Projects Ltd should present in their statement of financial position on 30 November 2021. Indicate clearly whether this will be a contract asset or a contract liability. Show all your workings to calculate the amount presented. Round to the nearest rand.
Expert Answer:
Answer rating: 100% (QA)
For Contract Revenue recognition accounting standards suggest two methods Percenta... View the full answer
Related Book For
Niebels Methods, Standards and Work Design
ISBN: 978-0073376318
13th edition
Authors: Andris Freivalds, Benjamin Niebel
Posted Date:
Students also viewed these accounting questions
-
The two members used in the construction of an aircraft fuselage are joined together using a 30° fish-mouth weld. Determine the average normal and average shear stress on the plane of each weld....
-
In the construction of railroads, it is important that curves be gentle, so as not to damage passengers or freight. Curvature is not measured by the radius of curvature, but in the following way....
-
In the construction of the flow process chart, what method can be used to estimate distances moved?
-
In an organization, managers communicate information downward to their departments and teams, and employees communicate information upward to their managers. If all members of an organization are not...
-
What is B2C e-commerce? What are some benefits of B2C e-commerce for consumers and for marketers? What are the limitations of B2C e-commerce?
-
What is the decimal value of the 2 in the hexadecimal number F42AC 16 ? a. 4096 10 b. 512 10 c. 256 10 d. 2 10
-
10. CPA QUESTION In general, which of the following statements is correct conceming the priority among checks drawn on a particular account and presented to the drawee bank on a particular day? a....
-
The debits to Work in ProcessRoasting Department for Morning Brew Coffee Company for August 2014, together with information concerning production, are as follows: All direct materials are placed in...
-
Current Attempt in Progress The controller of Trenshaw Company wants to improve the company's control system by preparing a month-by-month cash budget. The following information is for the month...
-
Food scientists have created a new oil. At room temperature, the oil is a liquid. As the oil gets colder however, it stiffens (thickens) into a sticky gel. To explore the properties of the oil, the...
-
Currency held outside banks $ 800 Demand Deposits 1000 Travellers Cheques 100 Other checkable deposits 200 Savings accounts 300 Money market accounts 100 Other near monies 200 a. What is the value of...
-
WALTERBORO Alex Murdaugh seemed to be in a hurry in the hour after his wife and son were brutally shot to death . The soon-to-be-disgraced Hampton trial attorney sped down a pothole-riddled country...
-
The risk-free rate of interest is 5% per annum with continuous compounding, and the dividend yield on a stock index is 3.2% per annum. The current value of the index is 100. What is the six-month...
-
What role does power play in shaping international relations, especially in terms of diplomacy, trade agreements, and military alliances, and how can nations navigate power imbalances to promote...
-
1) Assume that $2,000,000 of financial services costs is related to billing and managerial reporting and $1,000,000 is related to payroll and personnel management activities. What is the allocation...
-
How does the control of knowledge and information confer epistemic power to certain groups or institutions, and what are the implications for intellectual freedom, academic discourse, and societal...
-
m Golf Carts (ZGC) currently produces its own electric motors.Electco has offered to sell the electric motors to ZGC at a priceof $300 each. C's current production information for the motorsfollows 2...
-
Calculate the Lagrange polynomial P 2 (x) for the values (1.00) = 1.0000, (1.02) = 0.9888, (1.04) = 0.9784 of the gamma function [(24) in App. A3.1] and from it approximations of (1.01) and (1.03).
-
Explain how a proper work surface height would be determined.
-
An engineer was adjusting the gear box of a large steam engine while it was in operation and dropped a wrench into the path of the gears. As a result the engine was thrown out of alignment and badly...
-
Operators assemble pumps at an hourly rate of $10.00. The standard time for the assembly is 20 minutes. Direct material costs are $19.50/pump. Indirect labor and other overhead is calculated simply...
-
Immediately after Parental Times Ltd had acquired control of Offspring One Ltd and Offspring Two Ltd the following balance sheets were drawn up. You are to draw up a consolidated balance sheet....
-
Pop Ltd buys 100 per cent of the shares of Sibling Ltd on 31 December 2002. The balance sheets of the two companies on 31 December 2003 are as shown. You are to draw up a consolidated balance sheet...
-
Dad and Mum Ltd bought 60 per cent of the shares of Child 1 and 2 Ltd on 31 March 2004. The balance sheets of the two companies on 31 March 2005 are as follows. You are to draw up a consolidated...
Study smarter with the SolutionInn App