Wolseley's dilemma of Traditional Costing versus Activity Based Costing Wolseley Manufacturing Corporation manufactures various electronics products...
Fantastic news! We've Found the answer you've been seeking!
Question:
Transcribed Image Text:
Wolseley's dilemma of Traditional Costing versus Activity Based Costing Wolseley Manufacturing Corporation manufactures various electronics products and follows a traditional (job-order) costing system in which it applies manufacturing overhead to its products using a predetermined overhead rate based on direct labour-hours (DLHS). The company has two products, C18R and G19R, about which it has provided the following data: C18R G19R Direct materials per $10.20 $50.50 unit Direct labour per unit $8.40 $25.20 Direct labour hours per 0.40 1.20 unit Annual production 30,000 10,000 The company's estimated total manufacturing overhead for the year is $1,464,480 and the company's estimated total direct labour-hours for the year is 24,000. The company is considering using a variation of activity-based costing to determine its unit product costs for external reports. Data for this proposed activity-based costing system appear below: Activities and Activity Measures Estimated Overhead Cost Supporting direct labour (DLHS) $552,000 Setting up machines (setups) 132,480 Parts administration (part types) 780,000 Total $1,464,480 Activities C18R G19R Total Supporting direct labour 12,000 12,000 24,000 Setting up machines 864 240 1,104 Part 600 960 1,560 administration Mike, who is the controller of the Company, is currently overseeing the project to switch from traditional costing to Activity-Based costing. He is in a meeting with the Cost Accountant of the company. The Controller goes over the data and makes the following comments: "Activity-Based Costing is a revelation in the modern-day world of manufacturing Industry. If we are correctly able to categorize the various nature of work into essential levels, then we can dramatically trace the precise nature of the overheard activity." Jacob, the Cost Accountant, quips, "how can we classify those levels of activities? Do we have some mechanism to identify them?" Mike responds, "Yes! We do." Jacob then laments the pitfalls of the job order costing system, "The production report will be out soon and usually, the allocation bases (including overhead allocations in job- order costing systems) are not entirely accurate." Mike, with a pause, "That is exactly why we may eventually need to switch to the Activity-Based costing though it is comparatively difficult to implement with the cost and operations limitations involved in it." Jacob adds, "Another consideration to evaluate is the relationship between the cost of maximum (budgeted) capacity and idle capacity, since the company is likely to operate at maximum capacities during the time of peak demand. Moreover, our long-term goals of stable cost predictions and waste minimizations should also be kept in mind." "Alright! Let us calculate and analyze the quantitative and qualitative aspects of the data and other factors we have discussed in the meeting today and prepare the preliminary report for the CEO by this weekend." Mike with the final comments! Submission Instructions a. Determine the manufacturing overhead cost per unit of each of the company's two products under the traditional costing system. b. Determine the manufacturing overhead cost per unit of each of the company's two products under activity-based costing system. c. Compare the results in part a and b under both costing systems and specify the differences in both systems. d. What is the significance of the Activity Costing System that Mike is referring to? e. How is ABC system different from traditional costing system? f. The use of which activity level, budgeted (same as expected) or maximum capacity, is consistent with ABC? Explain. g. How might the use of ABC based on maximum capacity activity level enhance a firm's ability to compete on price? Explain. h. If you were to recommend one of the costing systems for Wolseley Inc., which one would you pick and why? Wolseley's dilemma of Traditional Costing versus Activity Based Costing Wolseley Manufacturing Corporation manufactures various electronics products and follows a traditional (job-order) costing system in which it applies manufacturing overhead to its products using a predetermined overhead rate based on direct labour-hours (DLHS). The company has two products, C18R and G19R, about which it has provided the following data: C18R G19R Direct materials per $10.20 $50.50 unit Direct labour per unit $8.40 $25.20 Direct labour hours per 0.40 1.20 unit Annual production 30,000 10,000 The company's estimated total manufacturing overhead for the year is $1,464,480 and the company's estimated total direct labour-hours for the year is 24,000. The company is considering using a variation of activity-based costing to determine its unit product costs for external reports. Data for this proposed activity-based costing system appear below: Activities and Activity Measures Estimated Overhead Cost Supporting direct labour (DLHS) $552,000 Setting up machines (setups) 132,480 Parts administration (part types) 780,000 Total $1,464,480 Activities C18R G19R Total Supporting direct labour 12,000 12,000 24,000 Setting up machines 864 240 1,104 Part 600 960 1,560 administration Mike, who is the controller of the Company, is currently overseeing the project to switch from traditional costing to Activity-Based costing. He is in a meeting with the Cost Accountant of the company. The Controller goes over the data and makes the following comments: "Activity-Based Costing is a revelation in the modern-day world of manufacturing Industry. If we are correctly able to categorize the various nature of work into essential levels, then we can dramatically trace the precise nature of the overheard activity." Jacob, the Cost Accountant, quips, "how can we classify those levels of activities? Do we have some mechanism to identify them?" Mike responds, "Yes! We do." Jacob then laments the pitfalls of the job order costing system, "The production report will be out soon and usually, the allocation bases (including overhead allocations in job- order costing systems) are not entirely accurate." Mike, with a pause, "That is exactly why we may eventually need to switch to the Activity-Based costing though it is comparatively difficult to implement with the cost and operations limitations involved in it." Jacob adds, "Another consideration to evaluate is the relationship between the cost of maximum (budgeted) capacity and idle capacity, since the company is likely to operate at maximum capacities during the time of peak demand. Moreover, our long-term goals of stable cost predictions and waste minimizations should also be kept in mind." "Alright! Let us calculate and analyze the quantitative and qualitative aspects of the data and other factors we have discussed in the meeting today and prepare the preliminary report for the CEO by this weekend." Mike with the final comments! Submission Instructions a. Determine the manufacturing overhead cost per unit of each of the company's two products under the traditional costing system. b. Determine the manufacturing overhead cost per unit of each of the company's two products under activity-based costing system. c. Compare the results in part a and b under both costing systems and specify the differences in both systems. d. What is the significance of the Activity Costing System that Mike is referring to? e. How is ABC system different from traditional costing system? f. The use of which activity level, budgeted (same as expected) or maximum capacity, is consistent with ABC? Explain. g. How might the use of ABC based on maximum capacity activity level enhance a firm's ability to compete on price? Explain. h. If you were to recommend one of the costing systems for Wolseley Inc., which one would you pick and why?
Expert Answer:
Answer rating: 100% (QA)
Solution of all parts are given below Answer Ans a Predetermined overhead rate Total Estimated Overhead Estimated Direct Labor Hours 1464480 24000 direct labor hours 6102 per direct labor hour Manufac... View the full answer
Related Book For
Fundamental Managerial Accounting Concepts
ISBN: 978-0078110894
6th Edition
Authors: Edmonds, Tsay, olds
Posted Date:
Students also viewed these accounting questions
-
Determine the missing amounts. Total Manufacturing Costs (1) $ (2) (3) $297,000 $ $312,000 Work in Process (January 1) $121,000 $464,000 $ Work in Process (December 31) $85,400 $ $98,800 Cost of...
-
You are appointed as a sustainability manager of Devils Corner Wines in the East Coast Region of Tasmania in June 2022. Devils Corner is nestled among the rolling patchwork fields of the beautiful...
-
This case examines the 2012 share repurchase decision of greeting card company American Greetings. At the time of the decision, American Greetings stock is trading at valuation multiples that are the...
-
Under which of the following circumstances would an auditor be most likely to intensify an challenging examination of a $500 imprest petty cash fund a. Reimbursement occurs twice each week. b. The...
-
On February 8, Leggett sent a telegram offering to sell Picarro a personal computer. Picarro received the telegram the same day (February 8). Picarro mailed a letter of acceptance on February 9 at 11...
-
A slider-crank mechanism shown in Fig. 11.37 is subjected to piston load of \(1 \mathrm{kN}, A B=250 \mathrm{~mm}\), \(B C=600 \mathrm{~mm}\). Determine the input torque to link \(A B\) for the...
-
How to prepare exhibits for trial?
-
Calculate the gravitational potential due to a thin rod of length l and mass M at a distance R from the center of the rod and in a direction perpendicular to the rod.
-
Plantation Green Limited is a major producer of processed coffee. On the 17 July 2018, it agreed to sell 200 kilograms of coffee to Grey-Drinks Restaurant. Both parties are located in X country in...
-
Which of the following is a positive reason for learning chemistry? (a) Chemistry is relevant to daily life (b) Chemistry offers career opportunities (c) Chemistry studies interesting topics (d)...
-
Grouper, Inc. provided the following information: July August Projected sales $218,000 $260,000 Projected merchandise purchases $140,000 $182,000 Grouper estimates that it will collect 40% of its...
-
What is the difference between volatile and nonvolatile memory? Give examples of each, noting any products that you or your family might own.
-
The school district should report expenditures for materials in its Special Revenue Fund of: In the school district Special Revenue Fund statement of revenues, expenditures, and changes in fund...
-
Why is viral adoption especially important to Uber and Roblox?
-
What strategic resources has Amazon as an early mover in cloud computing services?
-
What is the difference between a one-sided market and a two-sided market?
-
7 10 points eBook Print References You need $24,356 at the end of nine years, and your only investment outlet is a 11 percent long-term certificate of deposit (compounded annually). With the...
-
In the figure, two loudspeakers, separated by a distance of d1 = 2.63 m, are in phase. Assume the amplitudes of the sound from the speakers are approximately the same at the position of a listener,...
-
The following information was taken from the 2008 and 2009 Form 10-Ks for Dell, Inc. Required a. Explain whether each line of information in the table above would best be described as being primarily...
-
Parker Copies Company provides professional copying services to customers through the 35 copy stores it operates in the southwestern United States. Each store employs a manager and four assistants....
-
Lee Pet Supplies purchases its inventory from a variety of suppliers, some of which require a six-week lead time before delivering the goods. To ensure that she has a sufficient supply of goods on...
-
A semicircular trough of corrugated steel, with diameter \(D=1 \mathrm{~m}\), carries water at depth \(y=0.25 \mathrm{~m}\). The slope is 0.01 . Find the discharge.
-
For a sharp-crested suppressed weir of length \(B=8.0 \mathrm{ft}\), \(P=2.0 \mathrm{ft}\), and \(H=1.0 \mathrm{ft}\), determine the discharge over the weir. Neglect the velocity of approach head.
-
A rectangular sharp-crested weir with end contractions is \(1.5 \mathrm{~m}\) long. How high should the weir crest be placed in a channel to maintain an upstream depth of \(2.5 \mathrm{~m}\) for...
Study smarter with the SolutionInn App