Why is 06110 Rough Carpentry separate from 06120 Lumber in the job cost codes found in Figure
Question:
Why is 06110 Rough Carpentry separate from 06120 Lumber in the job cost codes found in Figure 2-6?
Transcribed Image Text:
Code Description 01000 GENERAL REQUIREMENTS 01100 Supervision 01400 General Labor 01600 Temporary Facilities 01700 Temporary Usities 01800 Temporary Phone 01900 Clean-Up 02000 EXISTING CONDITIONS 02050 Demolition 03000 CONCRETE 03200 Under-slab Gravel 03300 Footing & Found-Labor 03400 Footing & Found-Conc. 03450 Concrete Pump 03500 Slab/Roor-Labor 03600 Slab/Floor-Concreto 03650 Light Weight Concrete 03700 Pre-cast Concrete 03900 Robar 04000 MASONRY 04100 Masonry 05000 METALS 05100 Structural Stool 05300 Joist & Deck 05400 Misc. Stool 05900 Emotion 06000 WOOD, PLASTICS, & COMP. 06110 Rough Carpentry 06120 Lumber 06150 062 10 Trusses Finish Carpentry 07000 07100 07200 Insulation 07210 Foundation Insulation THERMAL & MOIST. PROT. Waterproofing 250 Fireproofing 07300 Stucco 07400 Siding 07450 Rain Gutters 07500 Roofing 07600 Flashings-Shoot Metal 07700 Roof Spedaties 07900 Caulking & Sealants COST CODES 08000 OPENINGS 08110 Metal Doors & Frames 08200 Wood Doo 08300 Overhead Doors 08400 Store Fronts 08700 Hardwar 08800 Glass & Glazing Code Description 09000 FINISHES 09050 Metal Studs 09100 Drywal 09200 Ceramic Tile 09300 Acoustical Treatment 09400 09800 Paint 09850 Carpet & Vinyl Wal Coverings 10000 SPECIALTIES 10400 Signage 10700 Toilet Partitions 10800 Toilet & Bath Accessories 11000 EQUIPMENT 11100 Appliances 12000 FURNISHINGS 12300 Cabinetry & Counter Tops 12350 Counter Tops 12500 Window Treatments 14000 CONVEYING SYSTEMS 14100 Elevators 20000 FIRE SUPPRESSION 21.100 Fire Sprinklers 22000 PLUMBING 22100 Plumbing 23000 HVAC 23100 HVAC 23200 Gas Lines 26000 ELECTRICAL 26100 Electrical 31000 EARTHWORK 31100 Grading & Excavation 32000 EXTERIOR IMPRO 32100 Asphalt 32200 Site Conc.-Labor 32300 Site Conc.-Concreto 32400 Signage 32500 Landscaping 32550 Fencing 32600 Dumpster Enclosures 32900 Outside Lighting 33000 UTILITIES 33100 33200 Water Line 33300 Storm Drain 33400 Gas Lines 33500 33600 Telephone Lines Sanitary Sawar Power Lines ENTS
Fantastic news! We've Found the answer you've been seeking!
Step by Step Answer:
Answer rating: 33% (3 reviews)
The separation of 06110 Rough Carpentry from 06120 Lumber in the job cost codes found in Figure 26 i...View the full answer
Answered By
Deepak Sharma
0.00
0 Reviews
10+ Question Solved
Related Book For
Construction Accounting And Financial Management
ISBN: 9780135232873
4th Edition
Authors: Steven J. Peterson
Question Posted:
Students also viewed these Business questions
-
A contractor has a contract to remove and replace the existing landscape and sidewalks around an office building. The work includes demolition of the existing landscaping and sidewalks, importing...
-
A contractor has a contract to construct the sanitary sewer, water line, storm drain, and street lighting for a new subdivision. The contractor uses the cost codes in Figure 2-6. The original...
-
Managing Scope Changes Case Study Scope changes on a project can occur regardless of how well the project is planned or executed. Scope changes can be the result of something that was omitted during...
-
Your friend, Daniel Nat, recently began work as the lead accountant for Asheville Company. Dan prepared the following balance sheet for December 31, 20Y5: Asheville Company Balance Sheet December 31,...
-
Revise each of the following sentences to replace hidden verbs with action verbs. 1. An understanding of stocks and bonds is important if one wants to invest wisely. 2. We must undertake a...
-
Discuss the criminal trial process.
-
4. YOU BE THE JUDGE WRITING PROBLEM Asher Hyman and Stephen Stahl formed a corporation named Ampersand to produce plays. Both men were employed by the corporation. After producing one play, Stahl...
-
Choosing cost drivers, activity-based costing, activity-based management. Pumpkin Bags (PB) is a designer of high quality backpacks and purses. Each design is made in small batches. Each spring, PB...
-
Islamic Banking and Finance. Bank invest in project as Sharik (sleeping partner) and the project manager will act as managing partner. The managing partner borrows Rs. 10,000 capital from the bank...
-
Why are fixed costs fixed only over a specified region?
-
Why must meals and entertainment be kept separate in the general overhead?
-
Average daily high temperatures in Ottawa, the capital of Canada, range from a low of 6 Celsius on January 1 to a high of 26 Celsius on July 1 six months later. See Figure 1.117. Find a formula for...
-
Compare some of the ways the societies provide care for their elderly members and critique the elder care practices of your society.
-
In cases where shamans and priests exist in the same society, shamans are unlikely to dispute the power of priests, but priests may deeply oppose shamans. Why should this be the case?
-
Explain the differences between bride service, bride wealth, and dowry and the ways that societies that practice each are likely to differ.
-
Compare and contrast monogamy, polygyny, and polyandry and give examples of each.
-
To what degrees are endogamy and exogamy practiced within American society? What kinds of groups are endogamous and exogamous?
-
Brain Size and Intelligence. The table below lists brain sizes (in cm3) and Wechsler IQ scores of subjects (based on data from "Brain Size, Head Size, and Intelligence Quotient in Monozygatic Twins,"...
-
H Corporation has a bond outstanding. It has a coupon rate of 8 percent and a $1000 par value. The bond has 6 years left to maturity but could be called after three years for $1000 plus a call...
-
Determine the annual budget for office utilities using the data from the past 12 months shown in Figure 9-7. Utility costs are expected to increase by 8% per year due to inflation. None of the...
-
Determine the annual budget for office utilities using the data from the past 12 months shown in Figure 9-7. Utility costs are expected to increase by 7% per year due to inflation. The company is...
-
Determine the projected costs for utilities in year 5. The inflation rate has been determined to be 0.222 and the initial cost is $57.39.
-
Which sentence contains correct parallel structure? a.Jenny likes rafting, hang gliding, and riding horses. b.Jenny likes to raft, hang gliding, and riding horses. c.Jenny likes rafting, to hang...
-
A teacher wants to use a RCR grammar lesson plan. In which section(s) would she be most likely to draw timelines of the target language on the board ? A. 1st restricted use and clarification B....
-
1. Consulting Revenue would appear on the: a. Balance Sheet b. Income Statement c. Statement of Owner's Equity 2.Notes Receivable would appear on the: a . Balance Sheet b. Income Statement c....
Study smarter with the SolutionInn App