BackFill Systems allocates manufacturing overhead based on machine hours. Each connector should require 11 machine hours. According

Question:

BackFill Systems allocates manufacturing overhead based on machine hours. Each connector should require 11 machine hours. According to the static budget, BackFill expected to incur: 1,045 machine hours per month (95 connectors X 11 machine hours per connector) \($5,650\) in variable manufacturing overhead costs \($7,900\) in fixed manufacturing overhead costs During August, BackFill actually used 865 machine hours to make the 78 connectors.

BackFill’s predetermined standard total manufacturing overhead rate is

a. \($12.97\) per machine hour.

b. \($15.66\) per machine hour.

c. \($7.56\) per machine hour.

d. \($5.41\) per machine hour.

Fantastic news! We've Found the answer you've been seeking!

Step by Step Answer:

Related Book For  book-img-for-question

Financial And Managerial Accounting

ISBN: 9780135080191

2nd Edition

Authors: Charles T Horngren, Jr Walter T Harrison

Question Posted: