A power company located in southern Alabama wants to predict the peak power load (i.e., the maximum

Question:

A power company located in southern Alabama wants to predict the peak power load (i.e., the maximum amount of power that must be generated each day to meet demand) as a function of the daily high temperature (X). A random sample of 25 summer days is chosen, and the peak power load and the high temperature are recorded each day. The file P10_40.xlsx contains these observations.
a. Create a scatter plot for these data. Comment on the observed relationship between Y and X.
b. Estimate an appropriate regression equation to predict the peak power load for this power company. Interpret the estimated regression coefficients.
c. Analyze the estimated equation’s residuals. Do they suggest that the regression equation is adequate? If not, return to part b and revise your equation. Continue to revise the equation until the results are satisfactory.
d. Use your final equation to predict the peak power load on a summer day with a high temperature of 100 degrees.

Fantastic news! We've Found the answer you've been seeking!

Step by Step Answer:

Related Book For  book-img-for-question

Data Analysis And Decision Making

ISBN: 415

4th Edition

Authors: Christian Albright, Wayne Winston, Christopher Zappe

Question Posted: