Question: A production line that produces protein bars operates 7 days per week, with three 8-hour shifts per day. The line was designed to produce bars

A production line that produces protein bars operates 7 days per week, with three 8-hour shifts per day. The line was designed to produce bars at a rate of 800 per hour. Last week the line produced 120,000 bars. What is the utilization of this production line?
Select one:
a. Greater than 80%, but less than 85%
b. Less than 80%
c. Greater than 85%, but less than 90%
d. Greater than 90%

Step by Step Solution

3.42 Rating (161 Votes )

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock

The utilization of production line Answer c Greater th... View full answer

blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Document Format (1 attachment)

Word file Icon

1019-B-C-A-C-P-A(3164).docx

120 KBs Word File

Students Have Also Explored These Related Cost Accounting Questions!