A time study was conducted on a job that contains four tasks. Tire observations and performance ratings

Question:

A time study was conducted on a job that contains four tasks. Tire observations and performance ratings for six cycles are shown in tire following table.
A time study was conducted on a job that contains

a. Calculate the average time for each task.
b. Calculate the normal time for each task.
c. Assuming an allowance factor of 15 percent of workday, calculate the standard time for this job.

Fantastic news! We've Found the answer you've been seeking!

Step by Step Answer: