Question: An AGVS will be used to satisfy material flows indicated in the from-to Chart in the table below, which shows deliveries per hour between stations
An AGVS will be used to satisfy material flows indicated in the from-to Chart in the table below, which shows deliveries per hour between stations (above the slash) and distances in meters between stations (below the slash). Moves indicated by "L" are trips in which the vehicle is loaded, while "E" indicates moves in which the vehicle is empty. It is assumed that availability = 0.90, traffic factor = 0.85, and efficiency = 1.0. Speed of an AGV = 0.9 m/s. If load handling time per delivery cycle = 1.0 min, determine the number of vehicles needed to satisfy the indicated deliveries per hour? Assume that availability = 0.90.
.png)
0 4 From1 0/0 9L 90 7L 120 5L/75 2 5E/90 00 O/NA 4L/80 3 7E 120 ONA 0/0 O/NA 4 9E75 O/NA ONA 0/0
Step by Step Solution
3.37 Rating (175 Votes )
There are 3 Steps involved in it
v c 09 ms60 smin 54 mmin Route 1 2 1 Te 10 90 9054 433 min 5 delive... View full answer
Get step-by-step solutions from verified subject matter experts
Document Format (1 attachment)
795-C-S-A-I (588).docx
120 KBs Word File