Question: An industrial load consumes 100kW at 0.8 pf lagging. If an ammeter in the transmission line indicates that the load current is 200 A rms,

An industrial load consumes 100kW at 0.8 pf lagging. If an ammeter in the transmission line indicates that the load current is 200 A rms, find the load voltage.

Step by Step Solution

3.32 Rating (170 Votes )

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock

P 100kw at 08 PF ... View full answer

blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Document Format (1 attachment)

Word file Icon

27-E-E-C-A (1723).docx

120 KBs Word File

Students Have Also Explored These Related Electrical Engineering Questions!