Question: Annual demand for a certain part is 10,000 units. At present the setup time on the machine tool that makes this part is 5.0 hr.
Annual demand for a certain part is 10,000 units. At present the setup time on the machine tool that makes this part is 5.0 hr. Cost of downtime on this machine is $200/hr. Annual holding cost per part is $1.50. Determine
(a) EOQ and
(b) Total inventory costs for this data. Also, determine
(c) EOQ and
(d) Total inventory costs if the changeover time could be reduced to six minutes.
Step by Step Solution
3.43 Rating (166 Votes )
There are 3 Steps involved in it
a EOQ 3641 pc b TIC 273075 27... View full answer
Get step-by-step solutions from verified subject matter experts
Document Format (1 attachment)
795-C-S-A-I (950).docx
120 KBs Word File
