As of the end of June, the job cost sheets at Racing Wheels, Inc., show the following
Question:
Job 102 was started in production in May and the following costs were assigned to it in May: direct materials, $ 6,000; direct labor, $ 1,800; and overhead, $ 900. Jobs 103 and 104 are started in June. Overhead cost is applied with a predetermined rate based on direct labor cost. Jobs 102 and 103 are finished in June, and Job 104 is expected to be finished in July. No raw materials are used indirectly in June. Using this information, answer the following questions. (Assume this companys predetermined overhead rate did not change across these months).
1. What is the cost of the raw materials requisitioned in June for each of the three jobs?
2. How much direct labor cost is incurred during June for each of the three jobs?
3. What predetermined overhead rate is used during June?
4. How much total cost is transferred to finished goods duringJune?
Step by Step Answer:
Fundamental accounting principle
ISBN: 978-0078025587
21st edition
Authors: John J. Wild, Ken W. Shaw, Barbara Chiappetta