Balance the assembly line in Exhibit 8.13 for (a) A shift output of 60 pieces and (b)

Question:

Balance the assembly line in Exhibit 8.13 for
(a) A shift output of 60 pieces and
(b) A shift output of 40 pieces.
Assume an eight-hour shift, and use the rule: choose the assignable task with the longest processing time. Compute the line efficiency for each case.
Balance the assembly line in Exhibit 8.13 for
(a) A shift