All Matches
Solution Library
Expert Answer
Textbooks
Search Textbook questions, tutors and Books
Oops, something went wrong!
Change your search query and then try again
Toggle navigation
FREE Trial
S
Books
FREE
Tutors
Study Help
Expert Questions
Accounting
General Management
Mathematics
Finance
Organizational Behaviour
Law
Physics
Operating System
Management Leadership
Sociology
Programming
Marketing
Database
Computer Network
Economics
Textbooks Solutions
Accounting
Managerial Accounting
Management Leadership
Cost Accounting
Statistics
Business Law
Corporate Finance
Finance
Economics
Auditing
Hire a Tutor
AI Study Help
New
Search
Search
Sign In
Register
study help
business
human resource management
Questions and Answers of
Human Resource Management
How does the operation process chart show materials introduced into the general flow?
How does the flow process chart differ from the operation process chart?
What is the principal purpose of the flow process chart?
What symbols are used in constructing the flow process chart?
Why is it necessary to construct process charts from direct observation as opposed to information obtained from the foreman?
In the construction of the flow process chart, what method can be used to estimate distances moved?
How can delay times be determined in the construction of the flow process chart? Storage times?
Based on the following crash cost table, what would be the minimum time to complete the project described by Figure 2-4, whose normal costs are shown in Table 2-2? What would be the added cost to
A study reveals the following steps in the assembly of a truss (small triangle 0f 3 small pieces within a large triangle of 3 larger pieces):forklift delivers 2x4 pieces of pine from outside storage
The current operation consists of the following elements:Operator removes pressed unit (0.2 min)Operator walks to inspection area, checks for defects (0.1 min)Operator files rough edges (0.2
Given the following OSHA recordable (i.e. those that must be recorded on the OSHA 200 log and open to inspection) injuries by job code and type of injury from January 1, 1997 to September 1, 1998,
Exploratory analysis has identified the following job as a problem area. Complete a flow process chart (material type) for the following engine stripping, cleaning and degreasing operation. Engines
Given the following operations and unit times in minutes (#1 = 1.5, #2 = 3, #3 = 1, #4 = 2, #5 = 4), balance the production line with the goal of producing 30 units/hr.
The following activities and times (in minutes) were recorded for a mold operator:- removes molded piece from die 0.6- walks 10 ft to a workbench 0.2- boxes widget and places on conveyor 1.0- walks
TOYCO produces toy shovels on a 20-ton press. The steps taken by the press operator to produce one shovel are:- remove finished shovel and put on conveyor 0.1 min- remove debris from the dies 0.2
In the project shown below, activities are represented by arrows, and the number for each activity also indicates its normal duration (in days).a) Determine the critical path and the length of this
ToolCO manufactures Philips (P), Torx (T) and Flathead (F) screwdrivers in different sizes (1,2,3,4,5). The IE manager is concerned about high product defect rates but has limited resources to
The following activities were observed for a mold operator:a) operator removes molded piece from die,b) walks to bench, puts the piece into box and the puts the box on a pallet,c) returns to
The machining time per piece is 0.164 hours and the machine loading time is 0.038 hours. With an Operator rate of $12.80 per hour and a machine rate of $14 per hour, calculate the optimum number of
Delpack manufactures 15 different wire harnesses for the Big 3 automakers (coded as B1, B2, and B3). The wire harnesses are also coded by their current draw in amps (A1, A2, A3, A4 and A5). Given the
Complete a flow process chart for a press operator: 1) Removes completed widget from press 2) Feels widget edges for roughness 3) Walks to a work bench and gets file 4) Files rough edges on widget 5)
The following activities and times (in minutes) were recorded for a press operator: removes completed widget from press (0.1), files rough edges on widget (0.4), blows filings from widget (0.3),
An injector machine goes down roughly 20% of the time (the injector gums up and needs to be cleaned, a quick process). One operator is assigned to service three identical such machines. Each machine
The following activities and times (in minutes) were recorded for a press operator: - removes completed widget from press, 0.1 - inspects widget, 0.4 - places widget on conveyor to next station,
A not-so-well-maintained machine is down roughly 40% of the time. One operator is assigned to service four identical such machines. Each machine can produce 60 widgets/hr if running (i.e. not
At Dorben Company, a worker is assigned to operate several machines. Each of these machines is down at random times during the day. A work sampling study indicated that on the average the machines
The analyst in the Dorben Company wishes to assign a number of like facilities to an operator based on minimizing the cost per unit of output. A detailed study of the facilities revealed the
A study revealed that a group of three semiautomatic machines assigned to one operator operate 70 percent of the time unattended. Operator service time at irregular intervals averaged 30 percent of
Based upon the following data, develop your recommended allocation of work and the number of work stations.
How many machines should be assigned to an operator for lowest cost operations when:a. Loading and unloading time one machine, 1.41 minutes.b. Walking time to next facility, 0.08 minutes.c. Machine
What proportion of machine time would be lost in operating four machines when the machine operates 70 percent of the time unattended and the operator attention time at irregular intervals averages 30
In an assembly process involving six distinct operations, it is necessary to produce 250 units per eight-hour day. The measured operation times are as follows: a. 7.56 minutes. b. 4.25 minutes. c.
Explain how design simplification can be applied to the manufacturing process.
When is an elaborate quality control procedure not justified?
What six points should be considered when endeavoring to reduce material cost?
How does a changing labor and equipment situation affect the cost of purchased components?
Explain how rearranging operations can result in savings.
What process is usually considered the fastest for forming and sizing operations?
How should the analyst investigate the setup and tools to develop better methods?
Give some applications of bar coding for the improvement of productivity.
What are the two general types of plant layout? Explain each in detail.
What is the best way to test a proposed layout?
Which questions should the analyst ask when studying work performed at a specific workstation?
How is operation analysis related to methods engineering?
Explain the advantages of using a checklist.
Why do costs vary little with distance in connection with automated guided vehicles?
On what does the extent of tooling depend?
How can planning and production control affect set-up time?
How can you best handle a material?
How is the travel chart related to Mother's SLP?
Why does the travel chart have more application in process layout than in product layout?
Explain the fundamental purpose of group technology.
Explain how the conservation of welding rod can result in 20 percent material savings.
Identify several automobile components with which you are familiar that have been converted from metal to plastic in recent years.
How do unnecessary operations develop in an industry?
Where would you find application for a hydraulic elevating table?
What is the difference between a skid and a pallet?
Compare and contrast operations analysis with the lean manufacturing approach.
What are the seven mudas?
What are the 5S pillars?
What is meant by 'tight' tolerances?
Explain why it may be desirable to "tighten up" tolerances and specifications.
What is meant by lot-by-lot inspection?
The finish tolerance on the shaft in Figure 3-4 was changed from 0.004 inches to 0.008 inches. How much cost improvement resulted from this change?
The Dorben Company is designing a cast-iron part whose strength T is a known function of the carbon content C, where: T=2C2+¾C-C3+k. To maximize strength, what carbon content should be specified?
To make a given part interchangeable, it was necessary to reduce the tolerance on the outside diameter from ±0.010 to ±0.005 at a resulting cost increase of 50 percent of the turning operation. The
The Dorben Group suite consists of five rooms having areas and relationships shown below. Obtain an optimal layout using Muther's SLP and SPIRAL. Compare and contrasts the resulting layouts.
Using the from-to chart showing the number of units handled from one area to another per hour and the desired size of each area (in square feet), develop an optimal layout using Muther's SLP. Note
Using Muther's SLP and the data shown below for a small machine shop, develop the best final layout to scale within the outer walls of the building shown below. Areas in square feet are: RM=1,000;
a. Using the following operations and elemental times (Op#1=0.3 Op#2=0.4 Op#3=0.3 Op#4=0.6 OP#5=0.4 minutes), develop a set of workstations that would most efficiently balance the production line and
Using Muther's SLP and the flow data shown below for a small machine shop, develop the best final layout to scale (use the grid) within the outer walls of the building shown below. Place your final
What structural components are found in muscles? What do these components have to do with muscle performance?
What basic motion generally precedes 'reach'?
What three variables affect the time for the basic motion 'move'?
How does the analyst or observer determine when the operator is performing the element 'inspect'?
Explain the difference between avoidable and unavoidable delays.
Which of the 17 therbligs are classed as effective, and usually cannot be removed from the work cycle?
Why should fixed locations be provided at the workstation for all tools and materials?
Which of the five classes of motions is preferred for industrial workers? Why?
Why is it desirable to have the feet working only when the hands are occupied?
What task factors increase the index of difficulty in a Fitts' Tapping Task?
What task factors increase the index of difficulty in a Fitts' Tapping Task? Discuss.
Explain elements of static and dynamic muscle performance with the sliding filament theory.
What factors affect back compressive forces during lifting?
What factors influence your measurement of isometric muscle strength?
Why do psychophysical, dynamic and static strength capabilities differ?
What methods can be used to estimate the energy requirements of a job?
What factors change the energy expended for a given job?
How does work capability vary with gender and age?
What limits endurance in a whole body manual task?
Describe the different types of muscle fibers and relate their properties with muscle performance.
Why does a change in the number of active motor units not result in a proportional change in muscle tension?
What does EMG measure? How is EMG interpreted?
Explain why workstation designers should endeavor to have operators perform work elements without having to lift their elbows.
What viewing distance would you recommend for a seated operator working at a computer terminal?
Define and give examples of the 17 fundamental motions, or therbligs.
How may the basic motion 'search' be eliminated from the work cycle?
What is the maximum load that can be raised by an outstretched stiff arm by a 50th percentile female?
A standing inspector picks up 25 lb castings from a conveyor 50 inches from the floor with a horizontal distance of 20 inches. He then puts the casting on a work area 20 inches lower than the
Consider a worker standing on the ground lifting crates of vegetables (10 in. high and 10 in. deep, 30 lbs) from the ground to the flat bed of the truck where another worker will move the box and
Showing 4000 - 4100
of 4587
First
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46