Find the average time per unit required to produce the 30th unit, if the slope parameter of

Question:

Find the average time per unit required to produce the 30th unit, if the slope parameter of the learning rate is 90% and the first unit takes 450 hours.
(a) -3.30693E-11
(b) 305.5404
(c) 268
(d) 347.3211