Given the potential one-foot thick slope failure along the circular arc shown in the sketch and the
Question:
Given the potential one-foot thick slope failure along the circular arc shown in the sketch and the data in Table 2.14, find the safety factor for slice 2 and for slice 7, then show algebraically the safety factor for the slope. Slope height is 120 ft (36.6 m), slope angle is 29?, and specific weight is about 95pcf (15kN/m3). Cohesion is 367 psf (17.6 kPa) and the angle of internal friction of the material is 16?.
Transcribed Image Text:
P bf !05 N' Ibf 105 (MN) (MN) Par. slice Weight Ibf 105 a() Lft (MN) Wn bf 105 (MN) W, Ibf 105 (MN) H ft (m) (m) 1.283 40 60 30 0.983 0.825 (0.370) 1.304 (0.584) 1.826 (0.575) 2.778 (1.245) 4.489 (18.29) (9.14) (0.440) 2.453 52 (15.85) (1.100) 75 28 30 (9.14) 30 24 4.101 (2.011) 6.413 (2.873) 10.90 (4.58) 11.33 (5.076) 10.29 (0.818) 1.443 (9.14) 30 (22.86) (1.837) 6.248 13 06 (27.43) (2.800) 97 (9.14) 56 (0.646) 0.570 (0.255) 1.976 (0.885) 4.185 (1.875) 3.629 10.885 (17.18) (29.57) (4.877) 97 (18.29) (29.57) (4.999) 82 10 60 11.158 24 75 9.400 (4.610) 5.985 (22.86) (24.99) (4.2110) 60 4.716 38 60 (2.681) 2.779 (18.29) (18.29) (2.113) 15 (17.18) (4.57) (0.880) (1.626) 1.965 (0.880) 1.172 (0.525) 1.965 45 6. 56 (1.245) 1.283 0.799 10 66 83 (0.575) (25.30) (0.358)
Fantastic news! We've Found the answer you've been seeking!
Step by Step Answer:
Answer rating: 54% (11 reviews)
Given Circular are failure data in Fig 233 and Table 214 Find FS2 FS7 show total FS WT 1 2 3 4 1 6 5 ...View the full answer
Answered By
Susan Juma
I'm available and reachable 24/7. I have high experience in helping students with their assignments, proposals, and dissertations. Most importantly, I'm a professional accountant and I can handle all kinds of accounting and finance problems.
4.40+
15+ Reviews
45+ Question Solved
Related Book For
Question Posted:
Students also viewed these Geological Engineering questions
-
Given the potential one-foot thick slope failure along the circular arc (R = 300 ft, 91.44 m) shown in the sketch and the data in Table 2.14, find the safety factor possible with drawdown of the...
-
Given the potential one-foot thick slope failure along the circular arc (R = 300 ft, 91.44 m) shown in the sketch, the data in Table 2.14, a slope height = 120 ft (36.6 m); slope angle = 29?,...
-
With reference to the wedge shown in the sketch and the Table 2.10 data, if the safety factor with respect to sliding down the line of intersection is greater than 1.10, then safety is assured. Can...
-
You and your spouse have earned salary and wages of $41,750. In addition you have municipal bond interest income of $600 and savings account and certificate of deposit interest income of $800. You...
-
(a) Find the -number of a telescope with an objective diameter of 8.3 cm and a focal length of 91 cm. (b) Find the aperture diameter of an /1.2 all-sky meteor camera lens with a focal length of 2.5...
-
Suppose that you need to estimate the mean number of typographical errors per page in the rough draft of a 400-page book. A careful examination of 10 pages gives an average of 6 errors per page with...
-
Repeat Example 13-5, but use a McCabe-Thiele diagram with mass ratio units. Example 13-5 A solvent stream containing 10% by weight acetone and 90% by weight chloroform is used to extract acetone from...
-
Consider an array of vertical rectangular fins, which is to be used to cool an electronic device mounted in quiescent, atmospheric air at T = 27C. Each fin has L = 20 mm and H = 150 mm and operates...
-
Weller Industrial Gas Corporation supplies acetylene and other compressed gases to industry. Data regarding the store's operations follow: Sales are budgeted at $370,000 for November, $390,000 for...
-
Call center A processed 1.2 million phone orders for a total of 2.4 million items. 50% of the orders are new customers and it takes 7 minutes to set up an order for a new customer. 50% of the orders...
-
With reference to the sketch illustrating a rotational slide being considered for a method of slices stability analysis, show that the inclusion of seismic forces as quasistatic horizontal forces...
-
Given the circular failure illustrated in the sketch, find algebraically the factor of safety. Assume that the material properties and geometry of slope and slices areknown. R.
-
Here are four sports problems, and three of them are based on true stories! Identify which problems call for a t-test, which call for a regression analysis, and which are handled by neither. So the...
-
Calculate the final temperature of the water from the following heat transfer experiment. 45 g of water at an initial temperature of 58 o C (Celsius) is added to 100.0 g of water at 100.0 o C. The...
-
Measuring the portfolio Beta Beta of stock D = 1.31 Beta of Stock E = 0.85 Beta of stock E = 0.94 If you invest 40 percent of your money in stock D, 30 percent in stock E, and 30 percent in stock F,...
-
A stock will pay a dividend of $7.07 in one year. If your discount rate is 0.11 per year, and the growth rate in dividends is a constant 0.02 per year, what is current stock price?
-
A firm plans to issue new shares of preferred stock to fund a new project. The new preferred stock shares will offer an annual dividend of $6 and will be sold to investors at a price of $100. The...
-
A firm's bonds currently have 20 years to maturity. These bonds have a 9.25% annual coupon, sell at a price of $1,075, and have a par value of $1,000. If the firm's tax rate is 40% , what is the...
-
The velocity potential for a spiral vortex flow is given by \(\phi=\) \((\Gamma / 2 \pi) \theta-(m / 2 \pi) \ln r\), where \(\Gamma\) and \(m\) are constants. Show that the angle, \(\alpha\), between...
-
The rate at which the temperature of an object changes is proportional to the difference between its own temperature and the temperature of the surrounding medium. Express this rate as a function of...
-
What were the bid price, asked price, and yield to maturity of the 3.5% February 2039 Treasury bond displayed in Figure 2.3? What was its asked price the previous day? Figure 2.3 Maturity 31-Dec-20...
-
A 1/4 by 3/2 -in steel bar has a 3/4 -in drilled hole located in the center, much as is shown in Table A151. The bar is subjected to a completely reversed axial load with a deterministic load of 1200...
-
From your experience with Prob. 639 and Ex. 619, you observed that for completely reversed axial and bending fatigue, it is possible to Observe the COVs associated with a priori design...
-
A shaft is loaded in bending and torsion such that Ma = 600 lbf in, Ta = 400 lbf in, Mm = 500 lbf in, and Tm = 300 lbf in. For the shaft, Su = 100 kpsi and Sy = 80 kpsi, and a fully corrected...
-
Why is high responsiveness a strategy to mitigate high demand uncertainty? What is the one problem caused by this high responsiveness?
-
A typical uncalibrated estimator _____. Is overconfident, tends to ignore prior knowledge, and emphasizes new data. Ignores new data and emphasizes prior knowledge. Balances overconfidence and...
-
1. Consider the following SPSS output of the correlation between Body Mass Index and Systolic Blood Pressure. a. Set up the hypotheses. [0.5 pt] b. Which test was used? [0.3 pt] c. What is the test...
Study smarter with the SolutionInn App