Greenwood Company manufactures two products-14,000 units of Product Y and 6,000 units of Product Z. The company
Question:
1. What is the company's plantwide overhead rate?
2. Using the plantwide overhead rate, how much manufacturing overhead cost is allocated to Product Y?
How much is allocated to Product Z?
3. What is the activity rate for the Machining activity cost pool?
4. What is the activity rate for the Machine Setups activity cost pool?
5. What is the activity rate for the Product Design activity cost pool?
6. What is the activity rate for the General Factory activity cost pool?
7. Which of the four activities is a batch-level activity? Why?
8. Which of the four activities is a product-level activity? Why?
9. Using the ABC system, how much total manufacturing overhead cost would be assigned to Product Y?
10. Using the ABC system, how much total manufacturing overhead cost would be assigned to Product Z?
11. Using the plantwide overhead rate, what percentage of the total overhead cost is allocated to Product Y? What percentage is allocated to Product Z?
12. Using the ABC system, what percentage of the Machining costs is assigned to Product Y? What percentage is assigned to Product Z? Are these percentages similar to those obtained in question 11? Why?
13. Using the ABC system, what percentage of Machine Setups cost is assigned to Product Y?
What percentage is assigned to Product Z? Are these percentages similar to those obtained in question 11? Why?
14. Using the ABC system, what percentage of the Product Design cost is assigned to Product Y?
What percentage is assigned to Product Z? Are these percentages similar to those obtained in question 11? Why?
15. Using the ABC system, what percentage of the General Factory cost is assigned to Product Y? What percentage is assigned to Product Z? Are these percentages similar to those obtained in question 11? Why?
Step by Step Answer:
Introduction to Managerial Accounting
ISBN: 978-0078025792
7th edition
Authors: Peter Brewer, Ray Garrison, Eric Noreen