In a production facility, an accurate estimate of hours needed to complete a task is crucial to
Question:
a. Fit the model E(y) = β0 + β1x1 + β2x2 + β3x3 + β4x4 to the data and give the prediction equation.
b. Conduct a test for the global utility of the model. Use a = .01.
c. Find a 95% confidence interval for E(y) when x1 = 150,000, x2 = 500, x3 = 1, and x4 = 0. Interpret the result.
d. What type of interval would you use if you want to estimate the average number of hours required to erect all industrial mud boilers with a capacity of 150,000 lb/hr and a design pressure of 500 psi?