In the aftermath of Hurricane Thelma, the U.S. Army Corps of Engineers is considering [two alternative approaches

Question:

In the aftermath of Hurricane Thelma, the U.S. Army Corps of Engineers is considering [two alternative approaches to protect a freshwater wetland from the encroaching seawater during high tides. The first alternative, the construction of a 5-mile long, 20-foot-high levee, would have an investment cost of $25,000,000 with annual upkeep costs estimated at $725,000. A new roadway along the top of the levee would provide two major benefits: (1) improved recreational access for fishermen and (2) reduction of the driving distance between the towns at opposite ends of the proposed levee by 11 miles. The annual benefit for :the levee has been estimated at $1,500,000. The second alternative, a channel-dredging operation, would have an investment cost of $15,000,000. The annual cost of maintaining the channel is estimated at $375,000. There are no documented benefits for the channel-dredging project. Using a MARR of 8% and assuming a 25-year life for either alternative, apply the incremental B-C J ratio (AB/AC) method to determine which alternative should be chosen.
MARR
Minimum Acceptable Rate of Return (MARR), or hurdle rate is the minimum rate of return on a project a manager or company is willing to accept before starting a project, given its risk and the opportunity cost of forgoing other...
Fantastic news! We've Found the answer you've been seeking!

Step by Step Answer:

Related Book For  book-img-for-question

Engineering Economy

ISBN: 978-0132554909

15th edition

Authors: William G. Sullivan, Elin M. Wicks, C. Patrick Koelling

Question Posted: