Refer to Figure 8.18. Given: ¢ H1 = 4 m ¢ D1 = 6 m ¢ H2

Question:

Refer to Figure 8.18. Given:
€¢ H1 = 4 m €¢ D1 = 6 m
€¢ H2 = 1.5 m €¢ D = 3.6 m
Calculate the seepage loss in m3/day per meter length of the sheet pile (at right angles to the cross section shown). Use Figure 8.10.