Refer to problems 33 and 34. Brazil Brewery hired an engineering consulting firm to perform an engineering
Question:
Facilities costs.................................................... $26,008.00
Beer production-level costs................................ $13.5 per hL produced
Raw materials costs............................................ $0.70 per kg consumed
Batch-level costs................................................ $60 per batch
Water costs......................................................... $0.90 per hL consumed
CIP costs............................................................ $18.5 per CIP performed
New product costs.............................................. $500 per new product
Required:
Assuming the following level of cost driver volume for a month, what is the estimated cost using the engineering estimates? (Don’t forget to include the facilities costs in your estimate.)
1,650................................... hL of beer produced
25,500................................. kg of raw materials consumed
100...................................... Batches
10,800................................. hL of water consumed
120...................................... CIPs
1.......................................... New product
Fantastic news! We've Found the answer you've been seeking!
Step by Step Answer:
Related Book For
Managerial Accounting An Introduction to Concepts Methods and Uses
ISBN: 978-0324639766
10th Edition
Authors: Michael W. Maher, Clyde P. Stickney, Roman L. Weil
Question Posted: