Refer to the background information in Exercise 17-60 for the Destin Company. One of the quality improvements

Question:

Refer to the background information in Exercise 17-60 for the Destin Company. One of the quality improvements management instituted recently was the use of statistical control charts. Over the most recent 12-week period, you have obtained the following average cycle-time data regarding the valve-production process:

Week Average Manufacturing Cycle Time (minutes)

1 ..............12.5

2 ..............18.0

3 ..............15.0

4 ..............10.0

5 ..............15.5

6 ..............12.8

7 ..............23.5

8 ..............16.5

9 ..............17.5

10 ..............11.0

11 ..............14.5

12 ..............16.0


Required

1. Use Excel to prepare a control chart from the weekly, sequential observations given above. Management has determined that the target performance level for cycle time is 14.0 minutes, and that the upper and lower control limits should be set, respectively, at 16.0 and 12.0 minutes.

2. What is the mean and what is the standard deviation of the 12 manufacturing cycle-time observations?

3. What conclusions can you draw about the process, based on the cycle-time data contained in your spreadsheet?

4. What is the primary difference between the control chart you produced and what is called a statistical control chart?


Fantastic news! We've Found the answer you've been seeking!

Step by Step Answer:

Related Book For  book-img-for-question

Cost management a strategic approach

ISBN: 978-0073526942

5th edition

Authors: Edward J. Blocher, David E. Stout, Gary Cokins

Question Posted: