Question: Run the HEC-HMS model with t = 15 min to reflect the existing conditions, the effect of the pond with existing conditions, fully developed conditions,
Run the HEC-HMS model with ∆t = 15 min to reflect the existing conditions, the effect of the pond with existing conditions, fully developed conditions, and the effect of the pond with fully developed conditions for both the 100-yr and the 10-yr design storms. Compare the peak flows at Junction 3 for the various run combinations.
Step by Step Solution
3.36 Rating (168 Votes )
There are 3 Steps involved in it
For both 10 yr and 100 yr storm events and all the different scena... View full answer
Get step-by-step solutions from verified subject matter experts
Document Format (1 attachment)
843-G-E-M (163).docx
120 KBs Word File
