Question:
Snyder Feeders manufactures bird feeders for wild bird specialty stores. In September, Snyder Feeders received an order from Wild Birds, Inc., for 24 platform bird feeders. The order from Wild Birds, Inc., became Job 1102 at Snyder Feeders. A materials requisition for Job 1102 is presented in the following section. In addition to the materials requisition, the labor time records (partial) for the week during which these feeders were made are presented. Other products were also being produced during that week, so not all of the labor belongs to Job 1102.
Requirements
1. Calculate the total for the Materials Requisition form. Post the information (cost and requisition number) from the Materials Requisition form to the Job Cost Record in the appropriate boxes.
2. Complete the labor time records for each of the employees. Once the labor time record is completed, post the information relevant to Job 1102 to the Job Cost Record for Job 1102.
3. Manufacturing overhead has already been added to the Job Cost Record. Complete the Job Cost Record by calculating the total job cost and the cost per unit. Remember that this job consisted of 24 feeders(units).
Transcribed Image Text:
Materials Requisition Number #1250 Dato 0/14 Job: 1102 Part Number WOCDO6 Description Quantity Unit Cost Arnount 40 82 26 %2.50 $1.00 $1.50 h-hewn cedar SSF0304 Stainless steel fasteners Reinforced aluminum screens Total Labor Time Record Employee: Greg Henderson Week: 9/14 9/20 Hourly Wage Rate: $11 Record #: 912 Job Date End Time Hours Cost NumberStart Time 9/14 0/14 9/15 etc. 1102 1103 9:00 1:00 100 5.00 Labor Tirme Record Employee: Andrew Peck Hourly Wage Rate7 Date Job Week: Qr14-9/20 Record a 913 Start Time End Time Cost 14 14 9/15 /15 otc. 1101 1102 1103 9:00 12:00 0:00 12:00 5.00 11:00 Job Cost Record Job Number. 1102 Custoner Wild Birds, Inc. Job Doscripion:24 Modol 3F (platom bird foodors) Date Started: Sep 14 Manufacturing Cost Information: Date Cormpleted: Cost Summary Direct Materials Req Direct Labor No. # No. # Manufacturing Overhead 9 hours х $3 per direct labor hour 27 Total Job Cost Nurnber of Units Cost por Unit