Mojo Ltd manufactures pond pumps in batches of 400. During April, Batch no. 145 had a slight
Question:
Mojo Ltd manufactures pond pumps in batches of 400. During April, Batch no. 145 had a slight manufacturing fault, resulting in only 390 pumps being completed. The remainder was scrapped. Costs were: raw materials £2,000, labour and overheads £3,000. What was the cost per pump?
(a) £12.82
(b) £12.50
(c) £500
(d) £10