=12.12. The Rustbelt Manufacturing Company employs a maintenance crew to repair its machines as needed. Management now

Question:

=12.12. The Rustbelt Manufacturing Company employs a maintenance crew to repair its machines as needed. Management now wants a computer simulation study done to analyze what the size of the crew should be, where the crew sizes under consideration are two, three, and four. The time required by the crew to repair a machine has a uniform distribution over the interval from zero to twice the mean, where the mean depends on the crew size. The mean is four hours with two crew members, three hours with three crew members, and two hours with four crew members.

The time between breakdowns of some machine has an exponential distribution with a mean of five hours. When a machine breaks down and so requires repair, management wants its average waiting time before repair begins to be no more than three hours. Management also wants the crew size to be no larger than necessary to achieve this.

Fantastic news! We've Found the answer you've been seeking!

Step by Step Answer:

Question Posted: