For the ethylbenzene process shown in Appendix B, check the design specifications for the following three pieces
Question:
For the ethylbenzene process shown in Appendix B, check the design specifications for the following three pieces of equipment against the appropriate heuristics: P-301, V-302, T-302. Comment on any significant differences that you find.
Transcribed Image Text:
V-301 H-301 R-301/2/3 E-301/2 R-304 E-303 E-304 E-305 V-302 T-301 E-306 E-307 V-303 P-302 A/B T-302 Benzene Feed Ethylbenzene Reactor Trans- HP LP Reactor L/V Benzene Benzene Benzene Benzene Benzene EB Feed Heater Reactors Inter- alkylation Steam Steam Effluent Separator Tower Reboiler Condenser Reflux Reflux Drum coolers Reactor Boiler Boiler Cooler Drum Pumps Tower Reboiler P-301 A/B Benzene Feed Pumps Benzene UC Ethylene °℃ /kPa V-301 3 XD+₂ FIC P-301 A/B 2 FIC 2000 H-301 23 - P-305 A/B H-301 400 4 6 R-301 500 380 8 hps TE-301 bfw R-302 11 10 hps R-304 bfw E-302 380 12 13 R-303 17 V-302 110\ E-303 E-304 E-305 A hps lps 20 ▲ bfw bfw CW 280 170 80 16 T-301 E-306 /2000 Ips 15 /110 FIC LIC cw YE-307 CW es (V-303) (LIC) X P-302 A/B 18 T-302 E-308 hps E-308 EB P-304 A/B FIC P-303 A/B EB Condenser Reflux Reflux Drum Pumps E-309 ខ្លួន EB CW (V-304) VE-309 P-303 A/B 20 V-304 EB P-304 A/B DEB Recycle Pumps P-305 A/B Benzene Recycle Pumps Fuel Gas Ethylbenzene 19
Fantastic news! We've Found the answer you've been seeking!
Step by Step Answer:
Answer rating: 75% (4 reviews)
Answered By
John Aketch
I have a 10 years tutoring experience and I have helped thousands of students to accomplish their educational endeavors globally. What interests me most is when I see my students being succeeding in their classwork. I am confident that I will bring a great change to thins organization if granted the opportunity. Thanks
5.00+
8+ Reviews
18+ Question Solved
Related Book For
Analysis Synthesis And Design Of Chemical Processes
ISBN: 9780134177403
5th Edition
Authors: Richard Turton, Joseph Shaeiwitz, Debangsu Bhattacharyya, Wallace Whiting
Question Posted:
Students also viewed these Engineering questions
-
For the styrene process shown in Appendix B, check the design specifications for the following three pieces of equipment against the appropriate heuristics: E-401, C-401, T-402. Comment on any...
-
For the drying oil process shown in Appendix B, check the design specifications for the following three pieces of equipment against the appropriate heuristics: V-501, P-501, H-501. Comment on any...
-
Managing Scope Changes Case Study Scope changes on a project can occur regardless of how well the project is planned or executed. Scope changes can be the result of something that was omitted during...
-
The Kingdom of Bhutan measures the happiness of its population, and government policy is formulated to increase Bhutans GNH (gross national happiness). Read about how the GNH is measured (try...
-
Refer to Exercise 30. In general, under what circumstances would the two allocation methods in parts a. and b. result in similar profit results?
-
Why is it important to have standards, such as X12 and EDIFACT, when conducting EDI transactions and other forms of e-business? Is there a downside to using standards?
-
How do job designs influence motivation?
-
The difference between practical capacity and master-budget capacity utilization is the best measure of managements ability to balance the costs of having too much capacity and having too little...
-
Spring Fresh produces premium bottled water. (Click the icon to view the additional information.) During February, the filtration process incurred the following costs in processing 200,000 liters:...
-
You have been tasked with recommending a pump for a corrosive service by considering three manufacturers. The after-tax, internal hurdle rate is 10%. Which of the following three alternatives do you...
-
Does Equation (12.1) apply to batch or semibatch separation processes? Why or why not? S= = [2(N-1)]! N!(N 1)! - (12.1)
-
a. What are some of the major objectives of the IMF? b. How is the IMF involved in international trade?
-
State the parameters corresponding to \(m,c, k\), and \(x\) for a torsional system.
-
True or False. The amplitude ratio attains its maximum value at resonance in the case of viscous damping.
-
True or False. The undamped natural frequency of a system is given by \(\sqrt{g / \delta_{\mathrm{st}}}\), where \(\delta_{\mathrm{st}}\) is the static deflection of the mass.
-
True or False. The half-power points denote the values of frequency ratio where the amplification factor falls to \(Q / \sqrt{2}\), where \(Q\) is the \(Q\) factor.
-
Fill in the Blank. The difference between the frequencies associated with half-power points is called the ___________ of the system.
-
Nationally, 38% of fourth-graders cannot read an age-appropriate book. The following data show the number of children, by age, identified as learning disabled under special education. Most of these...
-
The ultimate goal of Google, Bing, and other consumer search engines is to provide users with search listings that contain useful information on the topic of their search. What recommendations would...
-
The NCEES Rules of Professional Conduct (in the FE Supplied-Reference Handbook) was developed as a model code to be accepted by or modified by the individual state boards of professional engineers....
-
Study the student code of conduct (sometimes referred to as the honor code, the definition of academic dishonesty, or the students' rights and responsibilities) at your institution. Develop a...
-
View the (two-hour) movie Acceptable Risks, ABC-TV productions, 1986. Evaluate the actions taken by the headquarters management, the plant manager, the production engineer, and the maintenance...
-
Data governance provides Select one: A. Definitions, standards and procedures for how data is used. B. The internal data entry processes needed to capture accounting transactions. C. A road map that...
-
When it comes to cost allocation, there are various best practices that can be used. One is to thoroughly record the allocation process. This helps to guarantee that costs are allocated consistently...
-
Contractor Proposal Cost Calculation Table COST ELEMENT CHANGE ($) Material $5,000.00 Subcontracts $3,000.00 Direct Labor $2,000.00 Indirect Expenses (Fringe Only) (28.33%) $566.60 Other Direct...
Study smarter with the SolutionInn App