Which of the following scenarios represents a control deficiency? a. A missing control that is required for

Question:

Which of the following scenarios represents a control deficiency?

a. A missing control that is required for achieving objectives. 

b. A control that operates as designed. 

c. A control that provides reasonable, but not absolute assurance, about the reliability of financial reporting. 

d. An immaterial individual misstatement in internal control. 

e. None of the above.