A control deviation caused by an employee performing a control procedure that he or she is not
Question:
A control deviation caused by an employee performing a control procedure that he or she is not authorized to perform is always consid- ered a
a. Deficiency in design.
b. Deficiency in operation.
c. Significant deficiency.
d. Material weakness.
p-986
Fantastic news! We've Found the answer you've been seeking!
Step by Step Answer:
Related Book For
Auditing And Assurance Services A Systematic Approach
ISBN: 9780073337203
5th Edition
Authors: William Messier, Steven Glover, Douglas Prawitt
Question Posted: