An aluminum plant turns out two types of aluminum x1 and x2. Type 1 takes 6 hours
Question:
An aluminum plant turns out two types of aluminum x1 and x2. Type 1 takes 6 hours for melting, 3 hours for rolling, and 1 hour for cutting. Type 2 takes 2 hours for melting, 5 hours for rolling, and 4 hours for cutting. The plant has 36 hours of melting time available, 30 hours of rolling time, and 20 hours of cutting time. The profit margin is $10 for x1 and $8 for x2. Reduce the data to equations and inequalities suitable for finding the profit-maximizing output mix.