In Figure 2.8a , jobs arrive at times t = 0, 1, 1.5, 3.25, 5.25 and 7.75.
Question:
In Figure 2.8a , jobs arrive at times t = 0, 1, 1.5, 3.25, 5.25 and 7.75. The corresponding completion times are t = 2, 3, 3.5, 4.25, 8.25 and 8.75.
a. Determine the area of each of the six rectangles in Figure 2.8b and sum to get the total area A. Show your work.
b. Determine the area of each of the 10 rectangles in Figure 2.8c and sum to get the total area A. Show your work.
Figure 2.8 Illustration of Little’s Law
Fantastic news! We've Found the answer you've been seeking!
Step by Step Answer:
Related Book For
Computer Organization And Architecture Designing For Performance
ISBN: 9780134997193
11th Edition
Authors: William Stallings
Question Posted: