Arrange these electrical activities in the order that the work will be performed: Test, install conduit, pull

Question:

Arrange these electrical activities in the order that the work will be performed: Test, install conduit, pull wire, inspections, install boxes, terminate wire at device and panel, install panel, install device, drill holes in studs and joist (if a wood-framed building).