Question: In acceptance sampling the ideal operating characteristic curve would: a. Reject all lots that were above the AQL. b. Accept all lots that were above

In acceptance sampling the ideal operating characteristic curve would:

a. Reject all lots that were above the AQL.

b. Accept all lots that were above the AQL.

c. Have buyer’s risk below the AQL.

d. Have seller’s risk below the AQL.