What is the difference between a GMP cost estimate and a detailed cost estimate?
Question:
What is the difference between a GMP cost estimate and a detailed cost estimate?
Fantastic news! We've Found the answer you've been seeking!
Step by Step Answer:
Answer rating: 100% (QA)
A detailed estimate is usually base...View the full answer
Answered By
OTIENO OBADO
I have a vast experience in teaching, mentoring and tutoring. I handle student concerns diligently and my academic background is undeniably aesthetic
4.30+
3+ Reviews
10+ Question Solved
Related Book For
Cost Accounting And Financial Management For Construction Project Managers
ISBN: 9781138550650
1st Edition
Authors: Len Holm
Question Posted:
Students also viewed these Business questions
-
List three specific parts of the Case Guide, Objectives and Strategy Section (See below) that you had the most difficulty understanding. Describe your current understanding of these parts. Provide...
-
What is the difference between a point estimate and an interval estimate of a parameter? Which is better? Why?
-
What is the difference between a favorable cost variance and an unfavorable cost variance?
-
- A large, open bucket of water sits on a table. The height of the water level in the bucket is 4 m above the surface of the table. A small hole is made in the bucket at a distance of 10 cm above the...
-
Determine the angular momentum HD of the disk of Prob. 18.8 about point D. Problem 8.18: A homogeneous disk of mass m = 6 kg rotates at the constant rate 1 = 16 rad/s with respect to arm ABC, which...
-
What is the expected value of this game? You are about to play a game in which you draw 3 ping-pong balls without replacement from a barrel. The barrel contains 6 green balls and 4 red balls. If all...
-
evaluate the concept of a 360-degree feedback appraisal system and its challenges; and
-
Plevin Company ended its fiscal year on July 31, 2015. The companys adjusted trial balance as of the end of its fiscal year is shown below. Instructions (a) Prepare the closing entries using page...
-
Please do it for me step by step 4. Follow the proof of the Additivity Property in Theorem 1.5.2 to show that if c E R, 2 an = S, and z [7,, = T, then: n=0 n=0
-
What are some of the risks a contractor faces when developing a cost estimate? There are several.
-
What occurs with what? a) Planning: Estimate b) Startup: Correct c) Control: Record, Modify d) Close-Out: Record, As-build e) Lessons-learned: As-build
-
In Problems 114, a subset W of some n-space R n is defined by means of a given condition imposed on the typical vector (x 1 , x 2 , .... , x n ). Apply Theorem 1 to determine whether or not W is a...
-
TASK 1 (OF 2): While we have been talking about project management tools from the standpoint of an engineering or technology project, the tools can actually be used to help understand any type of...
-
At a railway station one train is handled at a time. The railway yard is sufficient only for two trains to wait while the other given signal to leave the station. Trains arrive at the station at an...
-
a) Prepare a Statement of Cash Flow for ABC Company for the year ended December 31, 2018 (Use Indirect method) b) Comment on the major reasons why cash flow from operations exceed net income. Sales...
-
Suppose we have a class File that represents an electronic document in a stand-alone, nonnetworked computer represented by class Computer. What sort of association exists between class Computer and...
-
Here are simplified financial statements for Phone Corporation in 2020: INCOME STATEMENT (Figures in $ millions) Net sales $ 13,700 Cost of goods sold 4,360 Other expenses 4,047 Depreciation 2,698...
-
Complete the following MRP record. Note that the minimum order quantity is 900. What is the average ending inventory over the six weeks?
-
1. True or False. Pitfalls to consider in a statistical test include nonrandom samples, small sample size, and lack of causal links. 2. Because 25 percent of the students in my morning statistics...
-
If you were a GC PM and could assemble any combination of delivery, procurement, and pricing methods and contract format from this chapter, along with organization styles from upcoming Chapter 4,...
-
List three items/documents included in a project manual beyond the technical specifications.
-
Research a material item or two, such as hollow metal door frames or carpeting or plumbing fixtures or storm system catch basins and look up the prior CSI specification division and section number...
-
Determine the current ratio ( round to one decimal place ) Current ratio = Current assets / Current Liabilities 7 . 1 9 4 . 3 5 6 . 9 2 1 3 . 7 3
-
premises was demolished at a cost of $ 3 , 3 6 0 , with $ 9 6 0 being received from the sale of materials. in December with payments made to the contractor in 2 0 2 3 as follows. The building was...
-
- 1 ( Financial statements of Leons Furniture Limited / Meubles L on Lt e ) Base your answers to the following questions on the financial statements for Leons Furniture Limited / Meubles L on Lt e in...
Study smarter with the SolutionInn App