Why should a contractor prepare its own preliminary construction schedule during the estimating process?
Question:
Why should a contractor prepare its own preliminary construction schedule during the estimating process?
Fantastic news! We've Found the answer you've been seeking!
Step by Step Answer:
Answer rating: 100% (2 reviews)
Cannot 100 rely on the owners sche...View the full answer
Answered By
Sagar Kumar
I am Mechanical Engineer with CGPA of 3.98 out of 4.00 from Pakistan. I went to Government Boys Degree College, Sehwan for high school studies.
I appeared in NUST Entrance Exam for admission in university and ranked #516. My mathematics are excellent and I have participated in many math competitions and also won many of them. Recently, I participated in International Youth Math Challenge and was awarded with Gold Honor. Now, I am also an ambassador at International Youth Math Challenge,
I have been teaching when I was in 9th class class year 2012. I have taught students from 6th class to university level.
5.00+
1+ Reviews
10+ Question Solved
Related Book For
Cost Accounting And Financial Management For Construction Project Managers
ISBN: 9781138550650
1st Edition
Authors: Len Holm
Question Posted:
Students also viewed these Business questions
-
Managing Scope Changes Case Study Scope changes on a project can occur regardless of how well the project is planned or executed. Scope changes can be the result of something that was omitted during...
-
The Custom Woodworking Company is a small-to-medium-sized custom furniture and cabinet making company, with head-office and a spacious plant site at Industrial Estates, Someplace, BC. Its Chairman...
-
Sixteen boxed-in ethical questions and scenarios were raised in this chapter. Prepare answers for each either as topics to debate in the classroom or as homework assignments to be turned in. Ethics...
-
What important retailing decisions to the target market and retailing marketing mix should be considered when investing in: Dunkin Donuts Little Caesars Pizza Starbucks
-
A 10-lb rod of uniform cross section is used to form the shaft shown. Knowing that the shaft rotates with a constant angular velocity of magnitude 12 rad/s, determine (a) The angular momentum HG of...
-
What's the expected value of the number of points you win? You roll a standard 6-sided die and win points equal to the square of the number shown.
-
Why would it be important to have a performance management system linked to and relatively consistent across all levels in an organization?
-
Yilan Company is considering adding a new product. The cost accountant has provided the following data. Expected variable cost of manufacturing ........ $57 per unit Expected annual fixed...
-
3. Consider the following information: State of Economy Probability of State of Economy Rate of Return if State Occurs Recession .20 .09 Normal .45 .11 Boom .35 .30 Required: Calculate the expected...
-
How does the 80-20 rule relate to estimate development?
-
Why would you, as a PM or superintendent or cost engineer, want to be involved in the estimate (or schedule) development for your project?
-
In Problems 1 through 10, a matrix A is given. Use the method of Example 1 to compute A 5 . 4-3 -1 0 2 0 1 1 2
-
Consider the minimum-time optimal control problem for the following harmonic oscillator: 1=22, 2=-+ || 1 that leads both states to the origin: x(t)=(0,0). (a) Form the Hamiltonian for this system and...
-
Shadee Corporation expects to sell 550 sun shades in May and 390 in June. Each shade sells for $153. Shadee's beginning and ending finished goods inventories for May are 65 and 55 shades,...
-
Calculate the small signal gain, input impedance, output impedance, and the output voltage swing of the circuit shown in Fig. 2. Ensure all transistors operated in saturation region, assume = 0. VDD...
-
You are a small distributor of items in the restaurant industry. Your supplier only packages the items at a quantity of 30 cartons per pallet. However, your largest customer requests that you ship to...
-
1) Therrell Corporation has two divisions: Bulb Division and Seed Division. The following report is for the most recent operating period: Bulb Division Seed Division Sales Variable expenses Traceable...
-
Republic Tool and Manufacturing Company of Carlsbad, California, makes a wide variety of lawn care products. One of Republics products is the Model Number 540 Broadcast Spreader: Complete the...
-
1. What is the semi-annually compounded interest rate if $200 accumulates to $318.77 in eight years? Answer in percentage with two decimal places. 2. What is the quarterly compounded interest rate if...
-
As a PM or PE or estimator, would you prefer to work on a projectbased or a home office staff organization, and why that choice? Assume for this exercise that even with a jobsite organization, the...
-
How do the responsibilities of the project manager differ from those of the project superintendent?
-
What is the procurement, pricing, and contracting methods chosen by the owner for the books case study project?
-
how do you do numbers 1 , 2 , 3 , and 4
-
\ table [ [ , Present Value of an Annuity of 1 , ] , [ Periods , 8 % ? ? , 9 % ? ? , 1 0 % ? ? , ] , [ 1 , 0 . 9 2 6 , 0 . 9 1 7 , 0 . 9 0 9 , ] , [ 2 , , 1 . 7 8 3 , 1 . 7 5 9 , 1 . 7 3 6 ] , [ 3 ,...
-
For the holidays, Michalis gave a watch worth $ 2 5 , 0 0 0 to Sobia and jewelry worth $ 4 0 , 0 0 0 to Natalie. a . Has Michalis made any taxable gifts this year and, if so , in what amounts? b ....
Study smarter with the SolutionInn App