For a specified level of production. the standard usage of materials is 25 metres and the standard
Question:
For a specified level of production. the standard usage of materials is 25 metres and the standard price is £3.00 per metre . The actual usage is 23 metres and the actual price £3.50 per metre . Calculate the relevant variances.