The delivered equipment cost for setting up a production and assembly line for two-way floating ball valves
Question:
The delivered equipment cost for setting up a production and assembly line for two-way floating ball valves is $650,000. If the direct cost and indirect cost factors are 1.82 and 0.31, respectively, and only the direct cost factor applies to delivered equipment cost, the total plant cost estimate is approximately:
(a) $2,034,500
(b) $2,401,230
(c) $2,684,500
(d) $2,983,000