Assume that the gage pressure p is the same at sections 1 and 2 in the horizontal
Question:
Assume that the gage pressure p is the same at sections 1 and 2 in the horizontal bend shown in the figure. The fluid flowing in the bend has density ρ, discharge Q, and velocity V. The cross-sectional area of the pipe is A. Then the magnitude of the force (neglecting gravity) required at the flanges to hold the bend in place will be
(a) pA,
(b) pA + ρQV,
(c) 2pA + ρQV, or
(d) 2pA + 2ρQV.
Fantastic news! We've Found the answer you've been seeking!
Step by Step Answer:
Answer rating: 72% (11 reviews)
a pA The force required to hold the bend in place is determined by the pressure ...View the full answer
Answered By
BillClinton Muguai
I have been a tutor for the past 5 years. I have experience working with students in a variety of subject areas, including computer science, math, science, English, and history. I have also worked with students of all ages, from elementary school to college. In addition to my tutoring experience, I have a degree in education from a top university. This has given me a strong foundation in child development and learning theories, which I use to inform my tutoring practices.
I am patient and adaptable, and I work to create a positive and supportive learning environment for my students. I believe that all students have the ability to succeed, and it is my job to help them find and develop their strengths. I am confident in my ability to tutor students and help them achieve their academic goals.
0.00
0 Reviews
10+ Question Solved
Related Book For
Engineering Fluid Mechanics
ISBN: 9781118880685
11th Edition
Authors: Donald F. Elger, Barbara A. LeBret, Clayton T. Crowe, John A. Robertson
Question Posted:
Students also viewed these Engineering questions
-
A piston/cylinder with cross sectional area of 0.01 m2 has a piston mass of 100 kg resting on the stops, as shown in Fig. P2.45. with an outside atmospheric pressure of 100 kPa, what should the water...
-
The sample means corresponding to populations 1 and 2 in Exercise 11.1 are 1 = 3.07 and 2 = 2.52. a. Find a 95% confidence interval for 1. b. Find a 95% confidence interval for the difference (1 - 2).
-
The sample means corresponding to populations 1 and 2 in Exercise 11.4 are 1 = 88.0 and 2 = 83.9. a. Find a 90% confidence interval for 1. b. Find a 90% confidence interval for the difference (1 - 2).
-
Q1- An engineering student is trying to create a new drivetrain system for his bike, consisting of a pully system. Pully A is connected to pully B by a non-slip belt and pully B is rigidly attached...
-
Find the cost of goods sold and the cost of ending inventory using the LIFO method, the table in Exercise 1, and the fact that the ending inventory is 82 units. Date of purchase Beginning inventory...
-
Does the tax treatment of below market-rate loans violate any income tax concepts? If so, how? Explain.
-
Zink Company owns 100% of the working interest in a fully developed lease on which there is a 1/8 royalty interest. The lease has the following capitalized costs and reserve data as of January 1,...
-
It is desired to obtain 500 VAR reactive power from 230 Vrms 50 Hz 1.5 KVAR reactor. What should be the angle of the AC to AC converter to be used? Calculate the THD of the current drawn from the...
-
The data given to the right includes data from 40 candies, and 10 of them are red. The company that makes the candy claims that 30% of its candies are red. Use the sample data to construct a 95%...
-
Draw the free-body diagram for the following problems. a) The beam in Prob. 515. b) The linkage in Prob. 516. c) The frame in Prob. 517. d) The beam in Prob. 518. -8 m- 75 N/m 800 Nm
-
The pipe shown has a 180 vertical bend in it. The diameter D is 1.25 ft , and the pressure at the center of the upper pipe is 15 p sig. If the flow in the bend is 40 cfs, what external force will be...
-
A hot gas stream enters a uniform-diameter return bend as shown. The entrance velocity is 100 ft /s, the gas density is 0.02 lbm/ft 3 , and the mass flow rate is 2 lbm/s. Water is sprayed into the...
-
Reengineering as a change strategy consists of streamlining, integrating, and ___________. a. finalizing b. evaluating c. transforming d. producing
-
A solid disk in a machine has a mass of 0.90 kg and a radius of 0.087 m. It takes 35 sec for the disk to come to rest from an initial speed of 150 rad/s. a) What was the initial rotational kinetic...
-
Mark has borrowed $18381 to finance the purchase a second hand car. The loan is to be repaid over five years with monthly payments. Interest on the loan is charged monthly at 8.8% p.a. How much will...
-
Explain the importance of developing a baseline budget for a project.
-
How about the OCI (Other Comprehensive Income) practice in Thailand? and please briefly describe it main content and your understanding about it.
-
Why are transfer prices based on total actual costs are not appropriate as the basis for divisional performance measurement?
-
Identify sources of risk and contrast them (include examples) and explain why investors should be concerned with them 250 words
-
Making use of the tables of atomic masses, find the velocity with which the products of the reaction B10 (n, ) Li7 come apart; the reaction proceeds via interaction of very slow neutrons with...
-
From the test specifications given in Table 5.2, show that the compactive energy in method C is 2700 kN m/m 3 . Table 5.2 Item Method A Method B Method C Diameter of mold 101.6 mm 101.6 mm 152.4 mm...
-
The results of a refraction survey (Figure 3.45a) at a site are given in the following table. Determine the thickness and the P-wave velocity of the materials encountered. Distance from the source of...
-
In a sandy soil, the maximum and minimum void ratios were determined to be 0.725 and 0.465, respectively. The specific gravity of the soil grains is 2.65. a. What would be the relative density of...
-
please help me with the website below to answer the questions wcms_760306.pdf (ilo.org) file:///C:/Users/carin/Downloads/wcms_760306%20(1).pdf A global survey of enterprises: Managing the business...
-
Manufacturing Company Balance Sheet Partial balance sheet data for Upper Crust Company at August 31 are as follows: Finished goods inventory $16,500 Prepaid insurance 16,800 Accounts receivable...
-
Lou Barlow, a divisional manager for Sage Company, has an opportunity to manufacture and sell one of two new products for a five- year period. His annual pay raises are determined by his division's...
Study smarter with the SolutionInn App