Given the three nonzero vectors A, B, and C, show that if ,A (B X C)
Question:
Given the three nonzero vectors A, B, and C, show that if ,A · (B X C) = 0 the three vectors must lie in the same plane.
Fantastic news! We've Found the answer you've been seeking!
Step by Step Answer:
Answer rating: 78% (14 reviews)
Consider A B x C AB XC cos 0 A c...View the full answer
Answered By
Rohith Bellamkonda
I am studying in IIT Indore,the most prestigious institute of India.I love solving maths and enjoy coding
5.00+
1+ Reviews
10+ Question Solved
Related Book For
Question Posted:
Students also viewed these Engineering questions
-
Given the three nonzero vectors A, B, and C, show that if A (BC) = 0, the three vectors must lie in the same plane.
-
Show that if 0 rt rt ear
-
If x and y are nonzero vectors in Rn and A = xyT, then the row echelon form of A will have exactly one nonzero row. In this case answer true if the statement is always true and false otherwise. In...
-
In Exercises 3344, use the graph of y = f(x) to graph each function g. g(x) = f(x) - 2 -4,0) -5-4-3 4-33 y = f(x) y (0,0) 2- 3.4 45 -2) (4-2) X
-
Multiple Choice Questions 1. The following cost formula for total purchasing cost in a factory was developed using monthly data. Purchasing cost = $123,800 + ($15 x Number of purchase orders) Next...
-
When and where did the "dust bowl" occur in the United States? What was its cause?
-
What is dilution of control?
-
For each of the problems listed, determine the following quantities for each activity: the earliest start time, latest start time, earliest finish time, latest finish time, and slack time. List the...
-
A firm is evaluating two projects, K and L, with an initial investment of $200,000. The projects have the following cash flows: Year Project K Project L 1 $75,000 $20,000 2 $75,000 $50,000 3 $75,000...
-
Determine the moment of the force F about point P. Express the result as a Cartesian vector. P X 2 m -3 m- 0 3 m- T A 1 m F = {2i + 4j6k) kN 3 m
-
Determine the coordinate direction angles of the force F applied at the end of the pipe such that the moment of F about point A is zero. 1 ft -A -2 ft- 3 ft 45 B F
-
Calculate the missing quantities four-figure accuracy. Value on base date (S) Current value Current index number Base value 7532 100 119.5
-
4. Two masses of 3 kg and 5 kg collide head-on, the former moving to the right with the speed 5 m/s and the latter moving to the left with the speed 3 m/s. After collision they stick together. What...
-
The following is a summary of an article. This paper examined the interaction between the transformational leadership behaviors of a former and new leader on employees' resistance and support for...
-
Activity 2C Estimated Time 10 Minutes (following the presentation) Objective To provide you with an opportunity to identify how to confirm target audience understand key concepts and ideas, and that...
-
For each brand in the following table, calculate the manufacturer's selling price (MSP), the per unit margin, and the gross margin as a percentage of MSP. MSRP Volume Discount Promotion Unit...
-
Roberto Trucks Inc. purchased a delivery van on January 1, 2022. Assume this was the company's only capital asset and that the company uses the year rule in the year of acquisition and disposal for...
-
What does correlation tell us?
-
Would you use the adjacency matrix structure or the adjacency list structure in each of the following cases? Justify your choice. a. The graph has 10,000 vertices and 20,000 edges, and it is...
-
Determine the moment of inertia for the shaded area about the x axis. Given: a = 4 in b = 2 in y = b cos(
-
Determine the moment of inertia for the shaded area about the y axis. Given: a = 4 in b = 2 in y = b cos( coN)
-
Determine the moment for inertia of the shaded area about the x axis. Given: a = 2 in b = 4 in c = 12 in 2
-
TB 05-75 2/10,n/30 is interpreted as
-
Kenneth Clark is one of Texas's premiere party planners. She purchases a variety of supplies, such as plastic tableware. stemware, and decorations, throughout the year. Kenneth has prepared the...
-
Problem 3-14 (Algo) Schedule of Cost of Goods Manufactured; Overhead Analysis [LO3-3, LO3-4] Gitano Products operates a job-order costing system and applies overhead cost to jobs on the basis of...