SML and Cost of Capital An all-equity firm is considering the following projects: Project Beta Expected Return

Question:

SML and Cost of Capital An all-equity firm is considering the following projects:

Project Beta Expected Return A 0.6 11%

B 0.9 13%

C 1.2 14%

D 1.7 16%

The expected return on the market is 12 per cent, and the current rate on UK gilts is 5 per cent.

(a) Which projects have a higher expected return than the firm’s 12 per cent cost of capital?

(b) Which projects should be accepted?

(c) Which projects would incorrectly be accepted or rejected if the firm’s overall cost of capital were used as a hurdle rate?