Calculate lead time obj. 1 Flint Fabricators Inc. machines metal parts for the automotive industry. Under the
Question:
Calculate lead time obj. 1 Flint Fabricators Inc. machines metal parts for the automotive industry. Under the traditional manufacturing approach, the parts are machined through two processes: milling and finishing. Parts are produced in batch sizes of 30 parts. A part requires 5 minutes in milling and 7 minutes in finishing. The move time between the two operations for a complete batch is 5 minutes.
Under the lean philosophy, the part is produced in a cell that includes both the milling and finishing operations. The operating time is unchanged; however, the batch size is reduced to 4 parts and the move time is eliminated.
Determine the value-added, non-value-added, and total lead times, and the valueadded ratio under the traditional and lean manufacturing methods. Round percentages to one decimal place.
Step by Step Answer:
Financial And Managerial Accounting
ISBN: 9781305267831,9781305267848
13th Edition
Authors: Carl S. Warren , James M. Reeve , Jonathan Duchac