Calculate lead time obj. 1 Williams Optical Inc. is considering a new lean product cell. The present
Question:
Calculate lead time obj. 1 Williams Optical Inc. is considering a new lean product cell. The present manufacturing approach produces a product in four separate steps. The production batch sizes are 45 units. The process time for each step is as follows:
Process Step 1 5 minutes Process Step 2 8 minutes Process Step 3 4 minutes Process Step 4 3 minutes The time required to move each batch between steps is 5 minutes. In addition, the time to move raw materials to Process Step 1 is also 5 minutes, and the time to move completed units from Process Step 4 to finished goods inventory is 5 minutes.
The new lean layout will allow the company to reduce the batch sizes from 45 units to 3 units. The time required to move each batch between steps and the inventory locations will be reduced to 2 minutes. The processing time in each step will stay the same.
Determine the value-added, non-value-added, and total lead times, and the value-added ratio under the
(a) present and
(b) proposed production approaches. Round percentages to one decimal place.
Step by Step Answer:
Financial And Managerial Accounting
ISBN: 9781305267831,9781305267848
13th Edition
Authors: Carl S. Warren , James M. Reeve , Jonathan Duchac