Factory overhead controllable variance OBJ. 4 Lo-bed Company produced 4,000 units of product that required four standard
Question:
Factory overhead controllable variance OBJ. 4 Lo-bed Company produced 4,000 units of product that required four standard hours per unit. The standard variable overhead cost per unit is $3.00 per hour. The actual variable factory overhead was $51,240. Determine the variable factory overhead controllable variance.