Determination of cost LO2 Pelican Ltd purchased land for use as its corporate headquarters. A small
Question:
Determination of cost LO2 Pelican Ltd purchased land for use as its corporate headquarters. A small factory that was on the land when it was purchased was torn down before construction of the office building began. A substantial amount of rock blasting and removal of soil then had to be done to the site before construction of the foundations of the building. Because the office building was set back from the public road, Pelican Ltd had the construction company build a paved road that led from the public highway to the entrance of the office building. Required Write a report to the group accountant of Pelican Ltd detailing which of the above expenditures should be capitalised.