Refer to the information in Problem 4-75. Required a. A local engineering firm claims it can revise
Question:
Refer to the information in Problem 4-75.
Required
a. A local engineering firm claims it can revise the production process such that product X-2 only requires 1.6 machine hours on the shared machine. How much would Clarke be willing to pay per period for the new process?
b. Suppose, instead, that the local engineering firm can revise the production process such that Product X-3 only requires 3.5 machine hours on the shared machine. (Product X-2 requires 2.5 machine hours as in Problem 4-75. How much would Clarke be willing to pay per period for the new process?
Problem 4-75