In a textile manufacturing plant, the waste dyeing water (cp= 4295 J/kg·K) at 75°C is to be used to preheat fresh water (cp= 4180 J/kg·K) at 15°C at the same flow rate in a double-pipe counter-flow heat exchanger. The heat transfer surface area of the heat exchanger is 1.65 m2and the overall heat transfer coefficient is 625 W/m2·K. If the rate of heat transfer in the heat exchanger is 35 kW, determine the outlet temperature and the mass flow rate of each fluid stream.