=+2 Direct manufacturing labour costs billed for 100 X7 seats were $6000. These costs include 16 hours of set-up labour at

$25 per hour, an amount included in the manufacturing overhead cost pool as well. The $6000 also includes 12 hours of design time at $50 an hour. Design time was explicitly identified as a cost the RAAF would not reimburse.