=+a Direct materials cost for the New CP99 is expected to be lower by $2.20 per unit.

Question:

=+a Direct materials cost for the New CP99 is expected to be lower by $2.20 per unit.

b Direct manufacturing labour cost for the New CP99 is expected to be lower by $0.50 per unit.

c Machining time required to manufacture the New CP99 is expected to be 20% less, but machine-hour capacity will not be reduced.