=+b Using the formula for a 90% learning curve, Labour-intensive assembly method Machine-intensive assembly method b =

Question:

=+b Using the formula for a 90% learning curve, Labour-intensive assembly method Machine-intensive assembly method b = ln 0.85 ln 2 = –0.162 519 0.693 147

= –0.234 465 b = ln 0.90 ln 2 = –0.105 361 0.693 147

= –0.152 004 Required 1 How many direct-assembly labour-hours are required to assemble the first eight helicopters under:

(a) the labour-intensive assembly method and

(b) the machine-intensive assembly method?